background image

TRADITIONAL HIGH LEVEL WC
Installation & care instructions

Please retain for future reference

2050mm MAX

Assemble the side entry 
inlet valve as shown.

Screw the float into the swivel arm screw 
and assemble inside the cistern tank as 
shown. Check for free movement of the 
float (ensure the float does not get caught 
on the side/back wall of the cistern).  To 
adjust the water level rotate the water level 
adjustment screw. Turn clockwise to 
reduce shut-off level, turn anti-clockwise to 
raise shut-off level, secure by hand 
tightening the locking nut.

The inlet valve is fitted with a high pressure 
seat (white), if water pressure is low, the 
inlet valve is supplied with a low pressure 
seat (red, attached to the inlet valve arm) 
that can be swapped.

1. The underside of the cistern can be a maximum of 2080mm off the floor. 

Fix the cistern brackets to the wall first. Put the cistern on top of the brackets and 
mark the positions of the holes on the wall. Screw the cistern to the wall using the 
fixing screws and washers supplied through the fixing holes in the back of the 
cistern. Ensure the tank is firmly secured to the wall.
The high level pipe kit can be cut down if required.

Note: Any screws and plugs supplied are suitable for stone/brick walls only. If in 
doubt consult and expert. 

FILL VALVE - ASSEMBLY IN CISTERN

ASSEMBLY INSTRUCTIONS

IMPORTANT

Flush out all impurities in the cistern prior to installation.

FLUSH VALVE SPECIFICATIONS

Full Flush: 6L

Ensure the flush valve is assembled and fully tightened as shown, making sure the 
rubber seal is over the thread of the valve and between the valve and the cistern.
Make sure that the fill valve and flush valve are not touching when assembled 
inside the tank.
Use PTFE tape around the thread to ensure a water tight seal as shown below.

FLUSH VALVE - ASSEMBLY IN CISTERN

Once the outlet valve is assembled in the cistern, keeping hold of the 
piston, remove the tie wrap. Once this has been removed, install the C-link 
to the piston. To make the installation easier, the piston may need to be 
pushed upwards from the underside.  

Tie Wrap

C-Link

1.

2.

Back Nut

Rubber Washer

Back Nut

Locking Nut

Adjustment Screw

Arm

Float Connection

Assemble the flush arm to the tank. Attach the flush arm to the C-link on the flush 
valve as shown. The handle and chain can then be attached to the flush arm.

Base
Seal

Siphon

FLUSH LEVER INSTALLATION

Back Nut

Round Head 
Bolt

Plastic Washer

Flush Arm 
Bracket

Brass Washer

Metal Nut

Flush Arm 

Chain 

1.

2.

REF: PL: 06 14 v1.0

Отзывы: