STEP 3
1. Attach three 4.5" Pulleys (#16) to the Weight Stack Frame ASSY (#1) using:
two M10*75 SHCS (#43)
four Φ11*Φ20*2 Flat Washer (#52)
one Pulley Spacer (#32)
two M10 Nylon Lock Nut (#54)
2. Attach the Top Bracket ASSY (#19) and two Bottom Bracket ASSY (#20) to the Weight
Stack Frame ASSY (#1) using:
two M8*20 SHCS (#47)
two Φ9*Φ16*1.6 Flat Washer (#53)
two M10*75 SHCS (#43)
four Φ11*Φ20*2 Flat Washer (#52)
two M10 Nylon Lock Nut (#54)
3. Attach Bottom Frame Brace (#3) to the Main Frame ASSY (#2) using:
three M12*30 SHCS (#41)
three Φ13*Φ24*2.5 Flat Washer (#51)
4. Attach the Left Arm Frame ASSY (#4), the Right Arm Frame ASSY (#5) to the Bottom
Frame Brace (#3) using:
two Spindles (#9)
four Cap Φ60 (#30)
four Circle Ring Φ62.5*5 (#31)
four M10*25 SHCS (#46)
5. Attach two Handle Frame ASSY (#6) to the Left Arm Frame ASSY (#4), the Right Arm
Frame ASSY (#5).
Note: 1. Wrench Tighten Bolts and Nylon Lock Nuts.
2. The Handle Frame ASSY (#6) Is Twisted Into The Depth Of 15mm.
3. Adjust the two Urethane Bumper on the Main Frame ASSY (#2), to make
sure the two handle bars of the Left Arm Frame ASSY (#4) and Right
Arm Frame ASSY (#5) on the same height.
Assembly
22
Содержание TF-IT9519
Страница 8: ...8 Exploded View and Parts List Overall...
Страница 11: ...11 Exploded View and Parts List Main Frame ASSY...
Страница 23: ...STEP 3 Assembly 23...
Страница 28: ......
Страница 30: ...Assembly 30 STEP 5...
Страница 31: ...Assembly 31 STEP 6...
Страница 34: ......
Страница 38: ......