MECHANICAL INSTALLATION 110SR

NEW / EXISTING CONSTRUCTION INSTALLATION PROCEDURES:

Before you begin:

Please read and understand all of these instructions thoroughly before beginning any work.

Note that construction work for the installation of all Tannoy products must be done to local building codes by qualified,
licensed installers. A local building inspector should approve any overhead installations. Always use safety goggles when
cutting material using a RotoZip™. Tannoy assumes no liability for cause and effect of improper installation work.

Your package includes:

• 110SR subwoofer system
• 11 piece supplied screw package
• Pre-Installation Ring (PIR - SOLD SEPARATELY)
• Individually packaged grille

Parts / tools required:

The following is a list of suggested materials and tools. Your needs may differ slightly at each site.

• Rotozip™ cutout tool and Guidepoint™ bit.
• 2ea. 1/2” #8 wood screws
• Cordless screw gun
• Combination square and /or tape measure
• Additional 2” x 4” lumber, in 24” pieces
• Trim saw (optional)

Site preparation and installation procedures:

Please note that the 110SR is designed for installation in a ceiling with exposed ceiling joists. The Pre-installation Ring must
be secured to the support structure; drywall alone will not support the weight of the subwoofer. Make certain that there is
sufficient clearance above the joist (minimum 12”) for the subwoofer installation.

Please refer to the photographs as a guideline for installing the pre-installation ring into a wood joist or stud ceiling.

1)

(Fig. 1) Measure the locations for two 24” strips of 2” x 2”  or 2” x 4” blocking. These must be used in order for secure
mounting to the pre-installation ring with 2 1/2” #8 wood screws. Use a combination square to measure the thickness
of the pre-installation ring (approx. 5/8” and then transfer the measurement to the joist.

2)

(Fig. 2) Screw the blocking to the joist with several evenly spaced screws. (Fig. 3) Fasten the pre-installation ring 
similarly to the blocking, Note that there are no pre-drilled holes; use the wood screws to go directly  through the 
pre-installation ring, keeping a 1” clearance from any “T” nuts. Note: the pre-installation must be installed with “T” 
nuts on the top side. The pre-installation ring is clearly marked for your safety and convenience.

3)

(Fig. 4) Shows the pre-installation ring installed against a steel stud furring channel. Attach the pre-installation ring
with screws directly through the furring and into 24” strips of blocking installed on the upper side of the channel so
that the screws will go into both. Ensure that overhead work is carried out safely and according to local building 
codes.

4)

After the pre-installation ring installation is complete, run your signal wires. At this time, have an electrician install 
electrical circuits for your sub, if required.

5)

Also at this time, we recommend that you install a safety line typically a light gauge wire rope, from a secure point 
on the support structure above the subwoofer. Attach this to the strapping on either side of the sub and suspend it
in case the installation is compromised. Follow the instructions for wire rope installation from you wire rope supplier
and check with your local building codes for specifics.

Содержание 110SR

Страница 1: ...110 SERIES SUBWOOFERS 110TB Tile Bridge 110SR Sheet Rock O W N E R S M A N U A L 110 Series Subwoofer ...

Страница 2: ...LLATION 110TB MECHANICAL INSTALLATION 110TB MECHANICAL INSTALLATION 110TB MECHANICAL INSTALLATION 110SR MECHANICAL INSTALLATION 110SR MECHANICAL INSTALLATION 110SR DIMENSIONS 110TB 110SR TECHNICAL SPECIFICATIONS 7 6 8 9 3 4 10 11 12 14 13 110 SERIES SUBWOOFERS Tannoy United Kingdom T 44 0 1236 420199 E enquiries tannoy com Tannoy North America T 00 1 519 745 1158 E inquiries tannoyna com Tannoy De...

Страница 3: ... Email inquiries tannoyna com www tannoy com For further information on our warranty policies please refer to our website Our customer service department is available normal office hours EST for questions regarding service purchase installation or any other technical matters Installation of Tannoy products should be performed by an experienced contractor familiar with local codes Failure to proper...

Страница 4: ...iteria without compromise 110TB TILE BRIDGE CABINET Simple yet sophisticated the 110TB is the first product of its kind a true ceiling mounted subwoofer Engineered to deliver low frequency extension 3dB 31 Hz and impact from a concealed ceiling mounted position the 110TB integrates almost invisibly into any indoor environment by using a standard air handling vent cover as a speaker grille The easy...

Страница 5: ...aker s and subwoofer should not be less than the minimum specified for your amplifier Long wire runs to and from this module need to be an appropriate gauge of speaker grade wire to retain proper damping and signal transfer characteristics LO PASS 100Hz PASSIVE 110 INPUT MODULE SPKR LEVEL INPUT MADE IN CANADA OUTPUT PASSIVE 70 VOLT Passive 70 Volt available for either option of passive units A 70 ...

Страница 6: ...atically switches power on and off in response to an audio signal A full complement of signal conditioning controls rounds out this very versatile controller See Active Module Controls for complete information The Active input module is UL and CSA listed 230VAC 50 Hz 1A 1 25A 250 Volts Fuse Auto ON OFF INPUT HI PASS OUTPUT 110 Series A C T I V E S U B W O O F E R PHASE O 180 LF BOOST O dB 4 dB EAR...

Страница 7: ...60 Hz for a more dramatic low end performance 6 EARTH LIFT Switches the internal ground connection from chassis to floating to help eliminate any possible ground loops that may cause hum or buzzing in the subwoofer or other pieces of gear 7 X OVER Mode The LO PASS position is used in most installations ALL PASS presents a full range signal to the subwoofer The ALL PASS mode allows the user to defe...

Страница 8: ... metal for example with a Hilti power fastening system Coupling nuts and backing nuts Figs 2 3 Threaded rod Fig 4 Turnbuckles Fig 5 Wire rope wire rope nuts thimbles chain quick links Figs 5 6 Wire grid tiles Fig 8 Note For 2 space x 2 space tile bridge drop in you will require wire grid support tiles on each of the four corners of the grid immediately beside the subwoofer This is usually accompli...

Страница 9: ...having reached the hanger bolt inside Now tighten up the backing nut on the rod to secure it from turning until it looks like Fig 4 Remember that the rod could otherwise be an eyebolt if you are using the wire rope suspension method or a Hilti type fastener Be sure to follow local building codes 4 Always install and utilize all four points and it should look like Fig 13 In this photo the turnbuckl...

Страница 10: ...led subwoofer top view only two chains attached Fig 10 Completed subwoofer installation Fig 11 Installing the hanger bolt Fig 12 Installed hanger bolt Fig 13 Suspension points with turnbuckles installed Fig 14 Leveled subwoofer Fig 15 Eyebolts in place of threaded rod Fig 16 Leveling the subwoofer ...

Страница 11: ... 1 Fig 1 Measure the locations for two 24 strips of 2 x 2 or 2 x 4 blocking These must be used in order for secure mounting to the pre installation ring with 2 1 2 8 wood screws Use a combination square to measure the thickness of the pre installation ring approx 5 8 and then transfer the measurement to the joist 2 Fig 2 Screw the blocking to the joist with several evenly spaced screws Fig 3 Faste...

Страница 12: ...tting depth for the second step Holding the tool up to the opening set the depth gauge so that the Guidepoint bit will now follow the recessed cutaway in the pre installation ring 10 After cleaning the remaining debris and dust from the opening it should look like Fig 6 Take note of the location and color of the 11 T nuts are gold in color to differentiate them from the remaining seven which are f...

Страница 13: ...tozip Fig 6 Completed install showing the reveal of the pre installation ring relative to the ceiling board Fig 7 Installing the subwoofer using the ledge to temporarily secure it Fig 8 Attaching the subwoofer to the pre installation ring Fig 9 Completed subwoofer detail Fig 10 Completed subwoofer installation Fig 11 Rotozip showing guidepoint bit ...

Страница 14: ... 8 3 4 19 5 8 18 17 3 4 2 10 8 SIDE VIEW DIMENSIONS 110SR SHIPPING WEIGHT WITH ACTIVE MODULE 37 LBS 10 BOTTOM VIEW 19 19 BACK VIEW 20 GRILLE 20 4 14 17 41 8 21 8 23 5 8 TOP VIEW 23 5 8 Pre installation Ring 1 1 4 14 13 12 1 4 SIDE VIEW 8 10 AMP PANEL SIDE VIEW 2 1 8 1 1 4 11 16 Pre installation ring SIDE VIEW ...

Страница 15: ...0 VAC 50 60Hz 16 Watts at idle 150 Watts at rated power Front mounted green LED in active mode when signal is present or on initial power up Green LED turns to red if signal is not present for more than two minutes indicating stand by mode The sub turns auto on when signal is re introduced Want to meet the rest of the family In addition to our complete family of 110 series subwoofers Tannoy offers...

Страница 16: ... 1236 420199 E enquiries tannoy com Tannoy North America T 00 1 519 745 1158 E inquiries tannoyna com Tannoy Deutschland T 00 49 0180 1111 881 E info tannoy com Tannoy France T 00 33 0 1 7036 7473 E ventes tannoy com 03 26 07 R3 0 ...

Отзывы: