background image

MECHANICAL INSTALLATION 110TB

NEW / EXISTING CONSTRUCTION INSTALLATION PROCEDURES:

Before you begin:

Please read and understand all of these instructions thoroughly before beginning any work.

Note that construction work for the installation of all Tannoy products must be done to local building codes by qualified, 

licensed installers. A local building inspector should approve any overhead installations. Tannoy assumes no liability for 

cause and effect of improper installation work.

Your package includes:

The 110TB ceiling subwoofer is complete with rubber isolation grid around the grille perimeter to drop neatly into a 

properly secured 2’ x 2’ ceiling grid without vibration or resonance.

Additional considerations:

Survey your site and choose installation locations. At this point, you may choose to suspend the subwoofer in free space 

or in a 2’ space x 2’ space dropped ceiling grid installation.

Parts / tools required: (Installation dependant)

• Hanger Bolts (Fig. 1.)

 These can be purchased for installation into wood or metal, for example, with a Hilti™ power 

fastening   system.

• Coupling nuts and backing nuts (Figs. 2 & 3).

 Threaded rod (Fig. 4).

 Turnbuckles (Fig. 5.).

• Wire rope, wire rope nuts, thimbles, chain, quick links (Figs. 5 & 6).

• Wire grid tiles (Fig. 8).

Note: For 2’ space x 2’ space tile bridge drop in, you will require wire grid support tiles on each of the four corners of the 

grid immediately beside the subwoofer. This is usually accomplished by means of the same wire support tie used to 

support the grid and for lighting fixtures etc... 

IT IS IMPORTANT TO ALWAYS TETHER THE SUBWOOFER SECURELY TO THE BUILDINGS PERMANENT 

STRUCTURE USING CHAIN (Fig. 9) OR WIRE ROPE. THIS IS THE SEISMIC TETHER POINT.

The list above is a suggested selection of parts only; what you require will depend on your suspension method and 

physical location.

The 110TB is supplied with four 3/8” closed eyebolts already attached. When suspending in free space, it is 

recommended that you use the same size hangers, nuts, rods and fittings; alternatively, if you are using wire rope, 1/8” 

rope and fittings are the smallest you should consider.

Fig. 1: 

Hanger Bolt

Fig. 2: 

Coupling Nut

Fig. 3: 

Backing Nut

Fig. 4: 

Threaded Rod

Assembly

Fig. 5: 

Turnbuckle

Fig. 6: 

Wire Rope Nut

&

 Thimble

Fig. 7: 

Quick-link

Содержание 110 Series

Страница 1: ...110 SERIES SUBWOOFERS 110TB Tile Bridge 110SR Sheet Rock O W N E R S M A N U A L 110 Series Subwoofer...

Страница 2: ...ON 110TB MECHANICAL INSTALLATION 110TB MECHANICAL INSTALLATION 110TB MECHANICAL INSTALLATION 110SR MECHANICAL INSTALLATION 110SR MECHANICAL INSTALLATION 110SR DIMENSIONS 110TB 110SR TECHNICAL SPECIFIC...

Страница 3: ...inquiries tcgroup americas com www tannoy com For further information on our warranty policies please refer to our website Our customer service department is available normal office hours EST for ques...

Страница 4: ...teria without compromise 110TB TILE BRIDGE CABINET Simple yet sophisticated the 110TB is the first product of its kind a true ceiling mounted subwoofer Engineered to deliver low frequency extension 3d...

Страница 5: ...not be less than the minimum specified for your amplifier Long wire runs to and from this module need to be an appropriate gauge of speaker grade wire to retain proper damping and signal transfer char...

Страница 6: ...oning controls rounds out this very versatile controller See Active Module Controls for complete information The Active input module is TUV listed POWER ON OFF RISK OF ELECTRIC SHOCK DO NOT OPEN CAUTI...

Страница 7: ...e dramatic low end performance 6 X OVER Mode The LO PASS position is used in most installations ALL PASS presents a full range signal to the subwoofer The ALL PASS mode allows the user to defeat the b...

Страница 8: ...metal for example with a Hilti power fastening system Coupling nuts and backing nuts Figs 2 3 Threaded rod Fig 4 Turnbuckles Fig 5 Wire rope wire rope nuts thimbles chain quick links Figs 5 6 Wire gri...

Страница 9: ...aving reached the hanger bolt inside Now tighten up the backing nut on the rod to secure it from turning until it looks like Fig 4 Remember that the rod could otherwise be an eyebolt if you are using...

Страница 10: ...ed subwoofer top view only two chains attached Fig 10 Completed subwoofer installation Fig 11 Installing the hanger bolt Fig 12 Installed hanger bolt Fig 13 Suspension points with turnbuckles installe...

Страница 11: ...1 Fig 1 Measure the locations for two 24 strips of 2 x 2 or 2 x 4 blocking These must be used in order for secure mounting to the pre installation ring with 2 1 2 8 wood screws Use a combination squar...

Страница 12: ...ting depth for the second step Holding the tool up to the opening set the depth gauge so that the Guidepoint bit will now follow the recessed cutaway in the pre installation ring 10 After cleaning the...

Страница 13: ...ozip Fig 6 Completed install showing the reveal of the pre installation ring relative to the ceiling board Fig 7 Installing the subwoofer using the ledge to temporarily secure it Fig 8 Attaching the s...

Страница 14: ...10 1 4 8 3 4 19 5 8 18 17 3 4 2 10 8 SIDE VIEW DIMENSIONS 110SR SHIPPING WEIGHT WITH ACTIVE MODULE 37 LBS 10 BOTTOM VIEW 19 19 BACK VIEW 20 GRILLE 20 4 14 17 41 8 2 1 8 23 5 8 TOP VIEW 23 5 8 Pre inst...

Страница 15: ...50 60 Hz 16 Watts at idle 250 Watts at rated power Front mounted green LED in active mode when signal is present or on initial power up Green LED turns to red if signal is not present for more than tw...

Страница 16: ...6 420199 E enquiries tannoy com TC Group Americas Inc T 00 1 519 745 1158 E inquiries tcg americas com Tannoy Deutschland T 00 49 0180 1111 881 E info tannoy com Tannoy France T 00 33 0 1 7036 7473 E...

Отзывы: