
General Instructions
Installation: (Vacuum Breaker)
1. Drill holes 3-3/4” center-to-center in
wall where you will be installing no.
1
.
Note: Please consult applicable
plumbing codes for proper installed
height of no.
1
over outlet of no.
13
.
2. Remove no.
3
from no.
1
, install no.
3
onto piping.
3. Reattach no.
1
to no.
3
, making sure
no.
2
is in place and tighten with a
wrench.
Installation: (Faucet Body)
4. After unpacking no.
4
, remove no.
6
,
no.
7
, no.
8
and no.
9
from no.
5
.
(Loosen no.
8
at base of no.
9
, slide
both off no.
5
.)
5. (For B-0695 ST and B-0696 ST
models, add no.
10
by using no.
11
to
join the couplings together.)
Make connections to no.
4
:
B-0695
: 1/2” IPS (Iron Pipe Size) female
union inlets; 1/2” close nipples.
B-0696:
5/8” union inlets; must solder
copper piping to inlets.
B-0695 ST
: use B-0416 stops; 1/2” NPT
(National Pipe Thread) piping.
B-0696 ST
: installer must supply 5/8”
solder joint to 1/2” NPT (National Pipe
Thread) adapter in order to attach supply
lines to no.
10
.
1
outlet
inlet
2
3
wall
6
7
8
8
5
11
10
wall
9
9
Use no.10 and no.11 for B-0695 ST
and B-0696 ST models
i n l e t
supply
l i n e
15
13
Installation: Nozzle
6. Attach no.
12
, onto supply pipe;
screw no.
15
into no.
13
attachment.
12
7. Mark holes on wall for attachment
of no.
16
; use provided no.
18
to
secure no.
16
to wall.
8. Insert no.
17
into hole of no.
16
.
18
16
17
15
9. Turn on water and check for leaks.
See flow diagram on page 8.