5
TC42.NG05.C 160508-12
Fig. #9
Fig. #11
Fig. #12
Fig. #10
Fig. # 7
The logs are packaged in a foam pack inside the box, they are fragile and should be
handled with care. Unpack and inspect log set. There should be a total of 9 logs. Gas
plumbing and vent connections should be
Position the logs as indicated by the following pictures. SEVEN logs have holes and /or
pins. Engage each pin in the corresponding holes. TWO of the logs do not have holes or
pins, they rest in position, locate as per the diagrams. (Fig. # 7-15)
Log Set Assembly
Fig. # 8
Fig. #14
Fig. #15
Fig. #13
BASE LOG, #a
LEFT CENTER LOG, #b
LEFT FRONT LOG, #c
LOG WITH HOLE, #d
RIGHT CENTER LOG, #e
FRONT RIGHT LOG, #f
CENTER TWIG, #h
RIGHT BASE LOG, #g
CENTER BASE CHUNK, #i