Reference Guide: TT128x High Definition Professional Receiver/Decoder
Page 2-1
ST.RE.E10141.5
Chapter 2
2.
Installing the Equipment
Contents
Read This First!......................................................... 2-3
Handling ....................................................... 2-3
Installing the Equipment ............................... 2-3
Lifting ............................................................ 2-3
Site Requirements ........................................ 2-3
Power Supplies............................................. 2-3
Environment ................................................. 2-3
Lightning Protection...................................... 2-3
Preliminary Checks ................................................... 2-4
Mechanical Inspection .................................. 2-4
Moving the Equipment Safely....................... 2-4
Installing the Equipment............................................ 2-5
Fixing ............................................................ 2-5
Ventilation..................................................... 2-5
Openings in the Covers ................................ 2-5
Care in Positioning ....................................... 2-5
Protection from Moisture .............................. 2-6
Installing Cables - Safety.............................. 2-6
EMC Compliance Statements................................... 2-6
EN 55022/AS/NZS 3548............................... 2-6
FCC .............................................................. 2-6
2.5
AC Supply Operating Voltage and Fusing - Safety
Information ................................................................ 2-6
AC Power Supply ......................................... 2-6
AC Power Supply Cord................................. 2-7
General......................................................... 2-7
Wire Colours................................................. 2-7
2.5.3
Connecting the Equipment to the AC
Power Supply ............................................... 2-8
-48 Vdc Power Supply............................................... 2-8
DC Power Supply ......................................... 2-8
Location of the DC Input Connector..............2-8
2.6.3
Connecting the Equipment to the DC
Power Supply................................................2-9
Protective Earth/Technical Earth...............................2-9
Signal Connections..................................................2-10
General .......................................................2-10
ASI Out .......................................................2-12
Audio Outputs .............................................2-12
SVGA Output (RGB HV) .............................2-13
Digital Video Output ....................................2-13
Frame Synchronisation ...............................2-14
Ethernet ......................................................2-14
Alarm Connector and Relay........................2-15
2.8.9
RS-232 Low-speed Asynchronous and
RS-422 High-speed Synchronous Data
Outputs .......................................................2-15
Option Card Connectors..........................................2-16
List of Figures
Figure 2.1: Air Flow Through the Equipment................................. 2-5
Figure 2.2: AC Power Inlet Assembly............................................ 2-7
Figure 2.3: Location of the Technical Earth................................... 2-9
Figure 2.4: Typical Decoder Rear Panel ..................................... 2-10
Figure 2.5: Signal Connections.................................................... 2-11
List of Tables
Table 2.1: Supply Cord Wiring Colours ......................................... 2-7
Table 2.2: Non Standard Supply Cord Wire Colours..................... 2-8
Table 2.3: ASI Out Connector...................................................... 2-12
Table 2.4: Analogue Audio Connectors....................................... 2-12
Table 2.5: SVGA Connector ........................................................ 2-13
Table 2.6: Digital Output Connector ............................................ 2-13
Table 2.7: Frame Sync Hi-Z Connector....................................... 2-14
Table 2.8: Ethernet Pin-outs........................................................ 2-14
Содержание TT1280
Страница 10: ...Introduction Page 1 2 Reference Guide TT128x High Definition Professional Receiver Decoder ST RE E10141 5 BLANK...
Страница 64: ...Alarms Page 5 2 Reference Guide TT128x High Definition Professional Receiver Decoder ST RE E10141 5 BLANK...
Страница 68: ...Options Page 6 2 Reference Guide TT128x High Definition Professional Receiver Decoder ST RE E10141 5 BLANK...