Tandberg Data StorageLoader 2U LTO Скачать руководство пользователя страница 4

StorageLoader 2U LTO

  

Quick Start Guide

Page 4 of 8

Step 4 

continued 

— Powering on and Removing the Shipping Lock

TOP VIEWS FOR REFERENCE ONLY

Important:

 Some views show the library with the 

top cover removed for clarity —DO NOT remove 
the top cover or you will void your warranty! 

5

 — Rotate the robot by pushing the lock handle 

toward the back of the library. This moves the 

 

locking “tab” out from under the rail. 

 

 

a. Gently push the lock handle to the right 

 

 

approximately 1 inch (2.5cm). 

 

Important: 

If you do not remove (rotate and lift) 

 

the shipping lock as described in steps b and c, 

 

you can catch and damage cables inside the library 
and render it useless.

 

 

b. Rotate the 

back

 of the lock up toward the 

 

 

top of the library 2 inches (5cm), and then 

lift 

 

 

the front of the lock up 2 inches (5cm). 

 

c. Slowly pull the shipping lock out of the 

 

 

opening.

6

 — Slide the left magazine 

straight

 back 

 

into the library.

7

 — Power the library on (press the 

I

).

8

 — Power the host computer on.

 

Reinsert the screw in the shipping lock and store 
them with these instructions in case you need to 
move or ship the library later.

Содержание StorageLoader 2U LTO

Страница 1: ...FC cable Power cord for use outside Europe If you plan to use the library outside Europe you must supply your own power cord see the Product Manual at www tandbergdata com for information about an In...

Страница 2: ...off position and that the power cord is disconnected from the library and the outlet WARNUNG Vor der Ausf hrung von Installations oder Wartungsarbeiten ist darauf zu achten da der Library Netzschalte...

Страница 3: ...he library by pressing the power switch on the back of the unit press the I When you apply power with the shipping lock installed the library displays a message and ejects both left magazines 2 Pull t...

Страница 4: ...the right approximately 1 inch 2 5cm Important If you do not remove rotate and lift the shipping lock as described in steps b and c you can catch and damage cables inside the library and render it us...

Страница 5: ...brary s cartridge inventory Move tapes into and out of the tape drive 3 Use LTOTool to a Detect the tape drive b Perform a Read Write test Note The readme files that accompany LibTool and LTOTool prov...

Страница 6: ...l number code level and SCSI ID and LUN or WWNN Library Settings Library Maintenance Operation Mode Library Status Mag 224 Main Menu vsd Password Ethernet DHCP4 IP Address Subnet Mask Gateway MAC Addr...

Страница 7: ...s and all other devices on the SCSI bus must also be LVD controller card terminator and all other devices on the bus If your backup software is not communicating with the library Bus configuration and...

Страница 8: ...ion Additional Information 1016989A REGISTER YOUR LIBRARY AT www tandbergdata com Copyright 2007 Tandberg Data Exabyte the Exabyte logo EZ17 M2 VXA and VXAtape are registered trademarks ExaBotics Mamm...

Отзывы: