4
5
6
4
1
Fig.
2
OPERATING
PROCEDURES
Fuel
(
Fig.
3
)
Fig.
3
WARNING
○
The
unit/machine
is
equipped
with
a
two-stroke
engine.
Always
run
the
engine
on
fuel,
which
is
mixed
with
oil.
Provide
good
ventilation,
when
fueling
or
handling
fuel.
○
Fuel
contains
highly
fl
ammable
and
it
is
possible
to
get
the
serious
personal
injury
when
inhaling
or
spilling
on
your
body.
Always
pay
attention
when
handling
fuel.
Always
have
good
ventilation
when
handling
fuel
inside
building.
Fuel
○
Always
use
branded
89
octane
unleaded
gasoline.
○
Use
genuine
two-cycle
oil
or
use
a
mix
between
25:1
to
50:1,
please
consult
the
oil
bottle
for
the
ratio
or
Tanaka
dealer.
○
If
genuine
oil
is
not
available,
use
an
anti-oxidant
added
quality
oil
expressly
labeled
for
air-cooled
2-cycle
engine
use
(JASO
FC
GRADE
OIL
or
ISO
EGC
GRADE).
Do
not
use
BIA
or
TCW
(2-stroke
water-cooling
type)
mixed
oil.
○
Never
use
for
four-stroke
engine
oil
or
waste
oil.
○
Always
mix
fuel
and
oil
in
a
separate
clean
container.
Always
start
by
fi
ling
half
the
amount
of
fuel,
which
is
to
be
used.
Then
add
the
whole
amount
of
oil.
Mix
(shake)
the
fuel
mixture.
Add
the
remaining
amount
of
fuel.
Mix
(shake)
the
fuel-mix
thoroughly
before
fi
lling
the
fuel
tank.
Fueling
WARNING
○
Always
shut
o
ff
the
engine
and
let
it
cool
for
a
few
minutes
before
refueling.
○
Slowly
open
the
fuel
tank,
when
fi
lling
up
with
fuel,
so
that
possible
over-pressure
disappears.
○
Tighten
the
fuel
cap
carefully,
after
fueling.
○
Always
move
the
unit
at
least
3
m
from
the
fueling
area
before
starting.
○
Do
not
smoke
and/or
allow
fl
ames
or
sparks
near
fuel
when
handling
or
fi
lling
fuel.
○
Always
wash
any
spilled
fuel
from
clothing
immediately
with
soap.
○
Be
sure
to
check
for
any
fuel
leakage
after
refueling.
Before
fueling,
clean
the
tank
cap
area
carefully,
to
ensure
that
no
dirt
falls
into
the
tank.
Make
sure
that
the
fuel
is
well
mixed
by
shaking
the
container,
before
fueling.
SPECIFICATIONS
MODEL
TRB24EAP
/
TRB24EA
TRB24EA
(
S
)
Engine
Size
(ml)
23.9
Spark
Plug
NGK
BMR7A
Dry
weight
(kg)
3.9
Fuel
tank
capacity
(l)
0.52
Sound
pressure
level
LpA
(dB
(A))
by
ISO22868
Uncertainty
(dB
(A))
By
ANSI
69*
2
By
CEN
87*
1
1.8*
1
Sound
power
level
Lw
measured
(dB
(A))
by
ISO22868
Sound
power
level
LwA
(dB
(A))
by
2000/14/EC
107*
1
109*
1
Vibration
level
(m/s
2
)
by
ISO22867
Uncertainty
(m/s
2
)
12
1.0
*1:
Equivalent
noise
level/vibration
level
are
calculated
as
the
time-weighted
energy
total
for
noise/vibration
levels
under
various
working
conditions
with
the
following
time
distribution:
1/7
Idle,
6/7
racing.
*2:
ANSI
B175.2
*
All
data
subject
to
change
without
notice.
ASSEMBLY
PROCEDURES
Blow
pipes
to
main
body
(
Fig.
1
)
Inspect
the
main
body
and
accessories.
Connect
straight
pipe
(1)
securely.
Align
projection
(2)
in
straight
pipe
with
groove
(3)
on
blower
housing
and
slide
the
pipe
into
the
blower
housing.
Rotate
the
pipe
clockwise
to
lock
it
into
place.
1
2
3
Fig.
1
Conic
pipe
to
straight
pipe
(
Fig.
2
)
○
Align
groove
(5)
on
the
conic
pipe
(6)
and
projection
(4)
on
straight
pipe
(1)
and
rotate
the
conic
pipe
in
place.
000Book̲TRB24EAP̲Eng.indb 4
000Book̲TRB24EAP̲Eng.indb 4
2012/06/04 17:44:33
2012/06/04 17:44:33