3 MACHINE OPERATION
A. LAMINATING FUNCTION
(1) LAMINATION
LOADING THE FILM
Unpack the upper and lower rods. Remove the feed tray. Load the film onto the rods by turning the
top rod clockwise and the bottom rod counter- clockwise as you push the rods through. Make sure to
leave equal lengths of rod out of each end using the guide marks to correctly position the roll of film.
Use Load the rods on the laminator.
Note: you cannot interchange the upper and lower rods.
THREADING THE FILM
Read the threading card supplied with each roll of film carefully. Do not mistake the stabilizer bar for the
idler roller.
1. To thread the film through the “hot rollers” & “pull rollers”, please pull the handle to the “UP”
position to separate upper & lower hot rollers. User can slide down the lower idler bar along the slot
for easier installation.
2. Thread the film by the rollers and make sure the film is perfectly aligned at the top and bottom.
Note: Overlap will cause the top film to deposit adhesive on the hot rollers and pull rollers, so
this procedure is critical.
3. Make sure the film is correctly threaded based on the threading guide. A threading diagram is also
located on the right side panel of the machine.
THREADING DIAGRAM
Содержание TCC1400F+
Страница 1: ...Roll Laminator Operating Manual TCC1400F...