background image

Z-Block Manual version 1.1

Page 10

Head (feet) 

Flow (gpm) 

Pump Performance Curve UPS-15-58

1st Speed 

2nd Speed 

3rd Speed 

10 

12 

14 

16 

18 

20 

10 

12 

14 

16 

AMPS 

115V 

WATTS 

HP 

CAPACITOR 

0.75 
0.66 

Spd. 3 
Spd. 2 

85
75

1/25 
1/25 

10mF/180V 
10mF/180V 

0.51

Spd. 1 

60 

1/25 

10mF/180V 

1

2

3

Component

Information

Inlet cone, bearing retainers, rotor 
can, rotor cladding, shaft retainer

304 Stainless Steel

Stator housing

Aluminum

Shaft, upper and lower radial bearings Aluminum Oxide Ceramic
Thrust bearing

Metal Impregnated Carbon

Check Valve

ACETAL with 302 Stainless Steel Spring & 
Nitrile Rubber Seals

Pump housing (Volute)

Composite

O’Ring and gaskets

EP (Ethylene Propylene Rubber)

Impeller

PES Composite (30% Glass Filled)

UPS 15-58 (3 Speed Pump)

 

• Flow range: 0 - 17 U.S. GPM

 

 

• Head range: 0 - 19 Feet

 

 

• Motors: 2 Pole, Single Phase

 

 

• Maximum fluid temperature: 230°F(110°C)

 

 

• Minimum fluid temperature: 36°F(2°C)

*  Maximum fluid temperature with Check Valve present: 200°F

Technical Data

Содержание Z-Block

Страница 1: ...Z Block Hydronic Zoning Block...

Страница 2: ...ual version 1 1 Page 2 Table of Contents Overview Options and Dimensions 3 Assembly 4 5 Application Examples 6 7 Included Components 8 Optional Accessories 9 Flow Diagram 9 Technical Data 10 Limited W...

Страница 3: ...0005 180 End Connection for creating primary secondary piping arrangement Injection pump controller not supplied 3 As a boiler pump in a Tamas multiple zone application You must use optional part 025...

Страница 4: ...bly of the components but does not cover all of the applications this unit can be used in 1 O Ring Installation 2 Air Vent Installation Add Silicon Grease to the O ring Slide O ring onto Attachment In...

Страница 5: ...2 Note Depending on orientation the Purge Valve can be installed in one of the End Caps To do this drill a 5mm 0 2 hole through the center opening on the end cap and insert Purge valve Lock with Valv...

Страница 6: ...cturers automatic or manual Air Vent When used for venting purposes it is required that the user drill a 5mm 0 2 hole in the bottom of the fitting The user must also drill a 5mm 0 2 hole in the bottom...

Страница 7: ...ition the Pump Head part 025 0010 will need to be inverted 180 as well To do this remove the 4 pump bolts and turn the pump head to the desired location Replace the screws when finished Do not spin th...

Страница 8: ...4 Nut 006 0325 x 2 1 Tail Piece 006 0331 x 2 11 4 Nut Seal 006 0332 x 1 Silicon Grease 025 0007 x 1 Sensor Purge Valve Clip 025 0015 x 1 Auto Vent 025 0013 x 1 Purge Valve 025 0014 x 1 Check Valve 025...

Страница 9: ...ing 025 0021 Optional Sensor Cable 025 0017 Optional Pressure Temp Sensor 025 0016 Accessories available from Tamas Hydronic Systems INC Phone 1 403 279 0020 Fax 1 403 279 0747 Email info tamashydroni...

Страница 10: ...er 304 Stainless Steel Stator housing Aluminum Shaft upper and lower radial bearings Aluminum Oxide Ceramic Thrust bearing Metal Impregnated Carbon Check Valve ACETAL with 302 Stainless Steel Spring N...

Страница 11: ...ystems option repair or replacement The foregoing warranties and remedies are exclusive and in lieu of all other warranties expressed or implied either in fact or by operation of law statutory or othe...

Страница 12: ...Email info tamashydronic com Web tamashydronic com TamasHydronicSystems TamasHydronics Accessories available from Tamas Hydronic Systems INC 3 Zones with Boiler Pump Z Bloc with Injection Pump Mixing...

Отзывы: