132
MAINTENANCE
When Required
3. Operate the cylinder, line up pin hole (B)
in the bucket with the pin hole in the link
arm (6), and install the pin (2).
4. Line up the turn prevention holes, install
the bolt (1), and the nuts.
Be sure to leave a gap of about 0.5 ~ 1 mm
(0.02 ~ 0.04 in.) between the nut and bucket
bush, or the nut will come loose.
5. Slide the O-ring (4).
E4G055
0.5~1mm
1
E4G056
4
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the diagram above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
E4G057
3
Содержание AF4E001
Страница 6: ...4...
Страница 8: ...6...
Страница 36: ...34...
Страница 91: ...89 TRANSPORT Loading and Unloading 90 Securing the Machine 91 Cautions on Transporting 92...
Страница 151: ...149 Main Specifications 150 Machine Dimensions 152 Operating Range 154 Lifting Capacities 157 SPECIFICATIONS...
Страница 153: ...151 MEMO...
Страница 154: ...152 SPECIFICATIONS Machine Dimensions J1K001 N L M D Q P J H K C F G A S E B R T U...
Страница 156: ...154 SPECIFICATIONS Operating Range J1K002 D J H K C F G A E B...
Страница 158: ...156 MEMO...
Страница 162: ...160...
Страница 167: ...165 OPTIONS Safety Signs Decals 1 No 03593 32200 2 No 03593 32300...
Страница 168: ...166 MEMO...
Страница 173: ...171 MEMO...
Страница 174: ...172...
Страница 175: ...173 INDEX...