48
Installation
TB9100 Installation and Operation Manual
© Tait Electronics Limited May 2006
You can also obtain the TBA0ST2 tool kit from your nearest Tait Dealer or
Customer Service Organization. It contains the basic tools needed to install,
tune, and service the TB9100 base station.
Mounting the Subrack
Caution
We recommend that you remove the modules from
the subrack before lifting it (refer to
), or have another person help
you with the lifting.
1.
Remove the front panel, as described in
2.
Fit the subrack into the cabinet or rack and secure it firmly with an
M6 (0.25in) screw, flat and spring washer in each of the four main
mounting holes
b
, as shown in
.
Figure 4.4
Subrack mounting points
b
main mounting holes - front
c
auxiliary mounting holes - rear
front view
rear view
b
c
Содержание TB9100
Страница 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Страница 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Страница 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 70: ...70 Base Station Operation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 122: ...122 Technical Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 126: ...126 Appendix A Interface Pin Assignments TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 130: ...130 Appendix B Inter Module Connections TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...