Tait TB8100 Скачать руководство пользователя страница 8

Tait Confidential

Tait Electronics Ltd

Tel64-3-357-9991

TN-1013-AN

[email protected]
http://support.taitworld.com

Date of Print: 12/03/07

Page 8 of 9

5.6

 

Reciter 2: Configured as a Link Transmitter and Receiver

Configure the channel name, frequency, power and channel spacing as per
section 5.3 with the following change:
Set the Filter to Flat Speech Band.
Set up the default channel profile as follows (refer section 5.2):
1.

 

Enable Tx path A.

2.

 

Set the Balanced Line output level to –10 dBm.

3.

 

Enable Rx Path A.

4.

 

Set the Balanced line input level to –10 dBm.

5.

 

Disable Talk through Repeater

6.

 

On the Tone-On-Idle tab, ensure that Tone On Idle is disabled
(Balanced Line Output and Unbalanced Line Output unchecked).

6

 

Set up the T805 Remote Site Unit

This procedure assumes that the
LEM card has been adjusted to
provide the nominal level to line
at the control site (1 kHz tone).

1.

 

Adjust RV201 for a level of 98 mV

RMS

 

±

 3 mV at “link I/P Testpoint” (pin

6 of J406).

2.

 

Set switch S303-7 to the OFF position.

3.

 

Key the TX

4.

 

Set RF test set filters to provide a 50 to 300 Hz BPF

5.

 

Adjust RV202 for the desired CTCSS deviation 

±

 5Hz.

6.

 

Set switch S303-7 to the ON position.

7.

 

Set switch S303-8 to the OFF position.

8.

 

Set RF test set filters to provide a 300 to 3000 Hz BPF

9.

 

Verify that deviation is 3.0 (1.5) kHz 

±

 0.2 (0.1) kHz

10.

 

If the site is required to operate as a “Talk Through” repeater in the
link fail condition:-
(A)

 

Feed a carrier modulated at the nominal system level into the
receiver of the base station at an RF level of –70 dBm.

(B)

 

Configure TR1 on the RSU for the desired timeout period (refer to
T805-26 manual)

(C)

 

Remove the link input connector from J414 (RJ11).

(D)

 

Allow timer TR1 to time out.

(E)

 

Adjust RV200 to achieve the same level of deviation as measured
in (9) above.

11.

 

Set switch S303-8 to the ON position.

12.

 

If Line Fail Talk Through is not required, set timer TR1 to zero (tr1,0)

7

 

Position and Layout of Equipment

During operation, the TB8100 base station can become hot. This is normal
since it is designed to operate at high temperatures. (The power amplifier
(PA) fan turns on when the PA temperature reaches 60° Celsius, this is
adjustable via Configure>Basestation>Fancontrol)
Consequently, any equipment placed directly above the TB8100 base
station will also become hot. It is therefore important that the layout and
position of equipment is carefully considered.

Содержание TB8100

Страница 1: ...stallation and Operation Manual TB8100 Specifications Manual Taitnet QS2 Simulcast System Manual 3 Equipment Required 3 1 TB8100 PMU and Rackframe If you intend to use the TB8100 base station in a sim...

Страница 2: ...Function RX Audio 1 1 RX Line Out RX Audio 2 2 RX Line Out CTCSS Output 3 5 TX Audio In TX Key 4 10 TX Key Ground 5 4 Ground RX Gate 6 9 RX Gate TX Audio 7 6 TX Line In TX Audio 8 7 TX Line In 4 2 Tai...

Страница 3: ...t you will need to make to the TB8100 base station s configuration file using the Service Kit application are as follows For further information on using the Service Kit please refer to the Service Ki...

Страница 4: ...nued SK Configure Base Station Task Manager Configure the following parameters 1 Enable the If Base station in run mode Then Enable auxiliary supply statement It is important that this supply remains...

Страница 5: ...ass filter This step is to prevent a small frequency offset being applied which could happen due to DC offsets The filter cut off frequency is approximately 0 8 Hz 4 Set the Unbalanced line input leve...

Страница 6: ...Set the Receive and Transmit frequencies 2 Name the channel 3 Set the receive CTCSS tone if used 4 Ensure the channel profile is set to Default Set the Filter to Pre De Emph Speech Band Note If you a...

Страница 7: ...larm will be raised if the external frequency reference either fails or is on the wrong frequency 5 5 Reciter 2 Configured as a Second Simulcast Channel Optional Configure the following parameters Set...

Страница 8: ...V202 for the desired CTCSS deviation 5Hz 6 Set switch S303 7 to the ON position 7 Set switch S303 8 to the OFF position 8 Set RF test set filters to provide a 300 to 3000 Hz BPF 9 Verify that deviatio...

Страница 9: ...al This message or document contains proprietary information intended only for the person s or organisation s to whom it is addressed All Recipients are legally obliged to not disclose Tait technologi...

Отзывы: