background image

IRDA BGA Rework Station T862++    User Manual 

Http://www.tech168.cn 

Installation 

 

1. Install the guide rod. Loosen the pinch nut of focusing support; put the 

guide rod in according to the direction of arrow icon pointing. 

Note:

  The  Infrared  Head,  Body  Mounting  and  Focus  Assembly  will  be 

installed in the T-862 chassis later. 

 

2.  Inventory  all  Items,  confirm  no  parts  are  missing.  If  parts  are  missing 

call 0086 538 6138575   

3.  Put  the  locating  ring  in.  Loosen  the  pinch  nut  of  locating  ring;  put  the 

locating ring in according to the arrow icon pointing and fasten the nut to 

the appropriate height. 

 

4. Machine Assembled 

 

Loosen the pinch nut of focusing support. 

The direction of guide rod 

Guide rod 

Locating ring 

The  direction  of  the 

locating ring 

Содержание T862++

Страница 1: ...IR BGA Rework Station T862 User Manual TAIAN PUHUI ELECTRIC TECHNOLOGY CO LTD www tech168 cn...

Страница 2: ...parts 4 1 Main body 4 2 Front panel 4 3 Back panel 4 4 Focusing support 5 5 Installation 7 1 Install the guide rod 7 2 Install the locating ring 7 3 Complete Assembly 8 4 Connecting wire of the lamp b...

Страница 3: ...ate it skillfully 4 No need for unsolder tools IRDA Welder T 862 can unsolder all the elements between 15 and 35mm 5 This machine has 600W hot melt system Its preheating area is 120x120mm 6 Infrared h...

Страница 4: ...Description Quantity Illustration T 862 Chassis 1 PCB Board holder 1 936 Searing iron 1 936 searing iron rack 1 Lamp Body and Lens D 28mm 1 Lens D 38mm 1 Lens D 48mm 1 Eye protection IR Filter 1 Cell...

Страница 5: ...e whole machine 2 Front Panel Cell guide The end covering Focus holder control knob Chassis working bench Preheat plate Lens for infrared lamp Front panel Eye Protection IR Filter Fan Protector Protec...

Страница 6: ...reheat plate The screen displayed the peak temperature of the IR lamp Preheat Switch Infrared Lamp Switch Temperature Set Point Entry Buttons Connecter for universal power line Connecter for 936Iron M...

Страница 7: ...62 User Manual Http www tech168 cn 6 3 Infrared Lamp Focus holder and others Focus holder control knob Fasten nut for focus holder Fasten nut for steady ring Focus holder Focus holder IR Lamp Cooling...

Страница 8: ...mbly will be installed in the T 862 chassis later 2 Inventory all Items confirm no parts are missing If parts are missing call 0086 538 6138575 3 Put the locating ring in Loosen the pinch nut of locat...

Страница 9: ...tate the guide rod Fasten the focusing support by rotating pinch nut of it Rip off the protective film of the filter 5 Connecting the wire of the lamp body Get the adapter of connecting wire plug in t...

Страница 10: ...tting value demonstrated on the keyboard display monitor after you turn on the machine 3 Put PCB on the corresponding notch in PCB support and adjust the pinch nuts of locating ring and focusing suppo...

Страница 11: ...the IR lamp temperature 350 Attention you should turn on the pre heat dish first and set up the temperature about 150 200 wait 3 5minutes to allow the temperature steady on the set up temperature and...

Страница 12: ...ttp www tech168 cn 11 2 Unsoldering operation Adjust temperature make the center of the infrared lamp aim at the unsoldered chip Once the tin is sufficiently melted remove the chip 3 Soldering operati...

Страница 13: ...168 cn 12 Put the tin ball and spread soldering flux not too thick only a thin layer of it on the soldering plate Put the chip in the accurate place after the solvent volatilizes out of soldering flux...

Страница 14: ...he component is too small you needn t use the IR lamp the 936 searing iron is enough Open the switch of the 936 searing iron set up the temperature then use it as you want Caution 1 Do not cut the pow...

Страница 15: ...he shipping company the airplane crew the customs agent or the carrier in your country and therefore take no responsibility for damage caused in transit Corollary When our machines leave QC they are t...

Отзывы: