
STEP 6
Remove the cable(12) from the selector shaft(21) and remove the 2 pan head Allen bolts M10x25(63), 2 spring
washers(74) and 2 flat washers(75) from the top of the tower frame(1). Then incline the 2 guide-rod(13) to the backside of the
tower frame(1), remove the top weight stack(18) with the selector shaft(21). Insert 15 weight stacks (22). Pay attention not to put
upside down. Put the top weight stack(20) and the selector shaft(21) back to the guide-rod(13). Then fix the 2 guide rods back to
the towers, using the Bolts and washers removed in the beginning. Then put back the cable(12) to the selector shaft(21). Using the
right tools tighten properly the nuts.
Nº
Englis h descript i on
Qt
1
TOW ER FRA ME
1
12
CA BLE
1
13
GUIDE-RO D
2
19
TOP WE IGHT ST ACK
1
21
SELE CTO R SHA FT
1
33
DE COR AT IVE CA P
2
63
PAN HEA D, ALLE N BOLT M10 x25
2
74
SPR ING WAS HER
2
75
FLAT WA SHE R
2