PRO CAN PUMP DUAL (PRO-CPD20)
Rev 1.6
2023/07/31
25/95
Copyright
©
2023 by TAEHA CORP. All Rights Reserved
3)
Press the Insert button.
At this time, select "YES" when the confirm pop-up is displayed.
4)
When the vent valve detects the material after the follower plate is lowered and the bond with
the pail is completed, the vent valve is turned off.
VENT SENSOR LED
ON
PAIL LIQUID DISPLAY
LEVEL SET-UP
CYLINDER DOWN OFF
5)
Pail replacement completed.
Use the RUN / STOP buttons from the control panel to drive the equipment.
For Level settings, see 6-2 Pail Settings.
Содержание PRO CAN PUMP DUAL
Страница 1: ...PRO CAN PUMP DUAL PRO CPD20 User manual...