Emerald ICE Installation, Programming & Maintenance Manual
3-7
In
stallation
3
2. Using
the
mounting
template
as
a
guide,
mark
the
two
(2)
mounting
screws
locations
on
the
TMB
for
he
mounting
position
preferred.
3. Pre
‐
drill
two
(2)
screw
holes
and
install
the
two,
pan
‐
head
No.
10
screws
(supplied)
into
the
backboard
with
a
screwdriver.
The
screw
heads
should
protrude
about
2cm
from
the
backboard
plywood
surface.
Содержание EMERALD ICE
Страница 1: ...Emerald ICE Digital Key Telephone System TM Installation Maintenance Manual...
Страница 3: ......
Страница 19: ...xiv Emerald ICE Installation Programming Maintenance Manual TC...
Страница 70: ...Emerald ICE Installation Programming Maintenance Manual 3 13 Installation 3...
Страница 71: ...3 14 Emerald ICE Installation Programming Maintenance Manual Installation 3...
Страница 77: ...3 20 Emerald ICE Installation Programming Maintenance Manual Installation 3...
Страница 89: ...4 12 Emerald ICE Installation Programming Maintenance Manual Basic Programming 4...
Страница 181: ...6 32 Emerald ICE Installation Programming Maintenance Manual Phone Trunk Programming 02 6...
Страница 261: ...7 80 Emerald ICE Installation Programming Maintenance Manual Phone Call Handling Programming 03 7...
Страница 299: ...8 38 Emerald ICE Installation Programming Maintenance Manual Phone System Resource Handling 04 8...
Страница 341: ...11 12 Emerald ICE Installation Programming Maintenance Manual Phone Extension Application Programming 07 11...
Страница 454: ...Appendix A Door Phone Installation Appendix A Door Phone Installation...
Страница 455: ......
Страница 464: ...Appendix B Feature Codes Appendix B Feature Codes...
Страница 469: ......