
3-18
Initial Power-up Tests
Coral IPx Office Installation Manual
Peripheral Interface Car
d Initialization
3
0
Preparing for Initialization
After the software has been installed and initialized:
1.
In the expansion cages, verify that the power supply switch is in the OFF
position (turned downwards).
Verify that all power supply units within the expansion units are turned OFF. If
the expansion units are turned ON before the main unit, the peripheral cards
within the expansion units will not initialize properly.
2.
Check the position of shared service and peripheral interface cards that will be
inserted into the system card cage. Observe any order previously directed or
any established convention of the distributor. See
Inserting a Peripheral Card into
and
refer to the following card placement diagrams:
Coral IPx Office Main Unit Card Placement
Coral IPx Office 1st Expansion Unit Card Placement
1st Expansion Cage IPx 500X Card Placement
2nd Expansion Cage IPx 500X Card Placement
1st Expansion Cage IPx 800X Card Placement
2nd Expansion Cage IPx 800X Card Placement
System with One FlexiCom 200 Expansion Unit
3.
Verify that all peripheral cards in the expansion cages protrude from the cage
by approximately 1 inch (2.5 cm).
4.
Attach the Program Interface (PI) device cable to the KB0 programming port
connector on the front side of the IPx Office unit.
...................................................................................................
2
System Initialization
Содержание Coral IPx Office
Страница 2: ......
Страница 4: ......
Страница 25: ...xxi Figure 11 10 WiFi Antenna Removal 11 18...
Страница 26: ......
Страница 28: ......
Страница 36: ...1 8 Introduction Coral IPx Office Installation Manual About this Manual 1 NOTES...
Страница 44: ......
Страница 52: ...2 8 Hardware Installation Procedure Coral IPx Office Installation Manual Site Inspection 2 NOTES...
Страница 96: ......
Страница 106: ...3 10 Initial Power up Tests Coral IPx Office Installation Manual Common Control Test 3 NOTES...
Страница 120: ...3 24 Initial Power up Tests Coral IPx Office Installation Manual Completing the Installation 3 NOTES...
Страница 122: ......
Страница 128: ...4 6 Software Installation Procedure Coral IPx Office Installation Manual Generic Feature Software Upgrade 4 NOTES...
Страница 138: ......
Страница 144: ...5 6 External Connections Coral IPx Office Installation Manual Main Distribution Frame MDF 5 NOTES...
Страница 182: ......
Страница 232: ...6 50 System Description Coral IPx Office Installation Manual System Configuration Options IPx Office 6 NOTES...
Страница 234: ......
Страница 258: ...7 24 Power Supply Coral IPx Office Installation Manual PS Office DC Power Supply Unit 7 NOTES...
Страница 260: ......
Страница 286: ...8 26 Common Control Cards Coral IPx Office Installation Manual MCB Office Card Main Control Board 8 NOTES...
Страница 302: ...8 42 Common Control Cards Coral IPx Office Installation Manual Compact Flash Disk 8 NOTES...
Страница 310: ...8 50 Common Control Cards Coral IPx Office Installation Manual DBM Card 8 NOTES...
Страница 312: ......
Страница 372: ...9 60 Shared Service Cards Coral IPx Office Installation Manual VoIP Media Gateway MG 9 NOTES...
Страница 382: ...9 70 Shared Service Cards Coral IPx Office Installation Manual Data Serial Ports RS 232E KB0 KB1 KB2 KB3 9 NOTES...
Страница 414: ...9 102 Shared Service Cards Coral IPx Office Installation Manual Accessory or Alarm Relay 3 Major Minor Alarm 9 NOTES...
Страница 420: ......
Страница 488: ......
Страница 494: ...11 8 System Networking Coral IPx Office Installation Manual NTU Office Card Description 11 NOTES...
Страница 509: ......