
8
9
2. Operational mode
2.1 OUTRIGGERS
Extend the outriggers outwards. Secure the
outrigger pads in the middle position (You
should feel a click) and lower the outriggers by
screwing them down clockwise.
2.2 OUTRIGGER MATS
Put the crane on the outrigger
mats. The mats should be
placed with the lifting hooks
positioned downwards.
NOTE: when in transport mode, place the
pads in their transport mode position.