Manual Go4Platin_en COMPLETE.docx / BG
24
JCM UBA-10-SS (stacker)
Periodical Cleaning
Depending on its environment and amount of use, the UBA bill acceptor may require routine
maintenance to restore optimum performance.
Under normal use, the UBA bill acceptor should be checked every 2 to 3 months. For
unusual operating conditions, such as when the UBA bill acceptor is exposed to a smoky
environment, dirt, dust, water spray, airborne oil, and/or sand, more frequent maintenance
will be required.
Содержание Go4Platin
Страница 1: ...Go4Platin Manual...
Страница 33: ...Manual Go4Platin_en COMPLETE docx BG 33 Wiring Diagram Main Harness...
Страница 34: ...Manual Go4Platin_en COMPLETE docx BG 34 Block Diagram Power Cables...
Страница 36: ...Manual Go4Platin_en COMPLETE docx BG 36 Assembly Display Section with 2 Displays Drawing...
Страница 37: ...Manual Go4Platin_en COMPLETE docx BG 37 Assembly Corpus Section Drawing...
Страница 38: ...Manual Go4Platin_en COMPLETE docx BG 38 Assembly Printer Section Drawing...
Страница 39: ...Manual Go4Platin_en COMPLETE docx BG 39 Assembly Note Acceptor Section Drawing...
Страница 40: ...Manual Go4Platin_en COMPLETE docx BG 40 Assembly Middle Door With Speakers Section Drawing...
Страница 41: ...Manual Go4Platin_en COMPLETE docx BG 41 EC Declaration of Conformity...
Страница 43: ...Manual Go4Platin_en COMPLETE docx BG 43...
Страница 50: ...Manual Go4Platin_en COMPLETE docx BG 50 Notes...