DHR/AR Series Environmental Test Chamber Getting Started Guide
Page 19
6
Connect the purge gas to the rheometer, as shown in
. If you have a suitable supply of nitrogen
gas (2 bar minimum pressure, nominal 10 L/min flow rate) it is recommended that you connect the feed
gases to the ETC as shown in
. Otherwise, connect as shown in
below.
CAUTION: The reducing valve is factory-set to 10 L/min and should not be adjusted.
MISE EN GARDE: Le soupape de réduction est réglée en usine à 10 L/min et ne doit pas être ajus-
tée.
Figure 13
Connecting the purge gas.
Figure 14
ETC connections using air as the agitation gas.