Installation Guide ODK Roof
2 (3)
Fig. 1 Place the corner and side brackets on top of the air handling unit. Position the roof to make sure the side brackets are in correct position.
Use the side bracket as a template and mark the position. Fasten the brackets with the enclosed screws.
Systemair Sverige AB · Industrivägen 3, SE-739 30 Skinnskatteberg, Sweden
Phone +46 222 440 00 Fax +46 222 440 99
247576-en_GB- vA002