FGS | PP-105_201608 | 3 / 16
1
1a
1b
3
2
4
5
6
1
FGS frame (consisting of two parts, „1a“ and „1b“)
2
Plaster / mortar / concrete filling
3
Screw, e.g. 5 × 100 (fabory 29385.050.100)
4
Screw, e.g. DIN 7982 C-H 4.2 × 13
5
This side of the frame is always aligned with the wall
6
Screw DIN 7504M-SR 4.2 × 25
- fix after inserting the FGS into the frame (Pos. 1)
Legend
Fig. 2: Wet installation of the FGS frame in a rigid wall using a mixture of plaster or mortar or concrete