Installation 3 - Soft
Installation in a Soft Crossing with fire-resistive coating
With this installation we recommend using flexible connection (see accessory FCR-C2) on both sides, due thermal
expansion of connected ducts during fire.
• Opening surfaces must be even and cleaned off. The flexible wall opening must be reinforced as per the standards
for plasterboard walls.
• For installation purposes, make a round opening with a diameter of DN + 60 mm into the wall.
• Insert the duct inside the middle of the opening.
Applies only for Installation with Continuous Duct:
With one end of the duct not further than 500 mm from the wall surface. The damper must remain accessible for
installation and inspection. Additional product label provided in the packaging must be applied on the duct on the
inspection side.
Applies only for Installation into the End of a Duct Fitted with Valve:
End of the duct must be aligned with the wall/ceiling surface on the side of future valve placement. Additional label
provided in the packaging must be applied in to the duct on the valve side.
• Prepare mineral wool filling (segments) with thickness of the opening height (F5).
• Apply the fire-resistive coating (F6) on the external surface of the wool filling where the future duct and hole surface
will be located.
• Immediately after the fire-resistive coating is applied, place the duct piece into the wall opening together with the
wool filling.
• Apply the same fire-resistive coating (F6), at least 2 mm thick and 100 mm wide, on the exposed filling and wall
edges evenly from both wall sides.
• Check the damper’s functionality
• Insert the open fire damper into the duct with the distance of 45 ± 10 mm from one wall edge to the damper body
(side with external gasket).
• Apply the included additional product label to the duct or wall next to the damper insertion.
• Close off the duct with a flexible duct coupling FCR-C2 or Valve.
IMPORTANT: Make sure the valve, when inserted, is not protruding in the blade area of F-C2 damper.
Installation Distances
According to the standard EN 1366-2, the minimum distance from the wall or ceiling to the duct that holds F-C2 is 75
mm. For multiple crossings through a fire resistive wall the minimum distance between two ducts that hold F-C2 is
200 mm. This applies for distances between the duct that holds F-C2 and a nearby foreign object crossing the fire
resistive wall.
3 Soft
F-C2
DN80 ... DN125
EI 60 (v
e
i ↔ o) S
a)
≥ 100
b)
≥ 100
360°
EI 90 (v
e
i ↔ o) S
EI 120 (v
e
i ↔ o) S
a)
≥ 150
b)
≥ 150
Notes:
3. Soft
- Soft Installation, Using Mineral Wool filing
a)
- Flexible (plasterboard) wall
b)
- Concrete/masonry/cellular concrete (rigid) wall
v
e
- Vertical supporting construction (wall)