Page 18
Installation
4.4 Water connections
The attachments at the water inlet and outlet
shall be connected in compliance with the in-
structions which can be found on the labels in
the proximity of the attachments.
Connect the water lines of the plants with the attach-
ments of the unit whose diameters and positions are
shown by Chapter 8.
4.5 Defrost water drainage
(only for AQVH units)
When heat pump units work in heating mode, during
defrosting cycles, they may discharge water from the
base. This is why the units should be installed at least
200 mm above the floor level, so as to allow the free
drainage of waste water, without the risk of produc-
ing ice banks.
The heat pump units must be installed in positions where
the defrosting water cannot create any damage.
4.6 Power supply
Before carrying out any operations on the
electrical system, make sure that the unit is
deenergised.
It is important that the appliance is grounded.
The company in charge of the installation
shall conform to the standards applicable to
outdoor electrical connections.
The manufacturer may not be held liable for any
damage and/or injury caused by failure to comply
with these precautions.
The unit conforms to EN 60204-1.
The following connections shall be provided:
n
A 3-phase and grounding connection for the power
supply circuit.
n
The electrical distribution system shall meet the pow-
er absorbed by the appliance.
n
The disconnecting and magnetothermal switches must
be sized to control the starting current of the unit.
n
The power supply lines and the insulation devices
must be designed in such a way that every line inde-
pendent.
n
It is recommended to install differential switches, to
prevent any damage caused by phase drops.
n
The fans and compressors are supplied through
contactors controlled from the control panel.
n
Each motor is provided with an internal safety ther-
mal device and external fuses.
n
The power supply cables must be inserted into dedi-
cated openings on the front of the unit, and the will
enter the electrical board through holes drilled on
the bottom of the board.
4.7 Electrical connections
The unit must be installed on site according to the
Machinery Directive Machinery Directive 2006/42/
EC, Electromagnetic Compatibility Directive
2014/30/EU and the usual procedures and stand-
ards applicable in the place of installation. The unit
must not be operated if its installation has not been
carried out according to the instructions provided in
this manual.
The power supply lines must consist of insulated cop-
per conductors, dimensioned for the maximum ab-
sorbed current.
Connection to terminals must be performed according
to the diagram of connections (User’s Terminal Box)
provided in this manual and according to the wiring
diagram which accompanies the unit.
Before connecting the power supply lines,
check that the available voltage value does
not exceed the range specified in the Electric
Data (Chapter 8).
For 3-phase systems, check also that the unbalance
between the phases does not exceed 2%. To perform
this check, measure the differences between the volt-
age of each phase couple and their mean value dur-
ing operation. The maximum % value of these differ-
ences (unbalance) must not exceed 2% of the mean
voltage.
If the unbalance is unacceptable, contact the Energy
Distributor to solve this problem.
Supplying the unit through a line whose un-
balance exceeds the permissible value will
automatically void the warranty.
WARNING
WARNING
WARNING
DANGER
DANGER
DANGER
Содержание AQVC 105
Страница 60: ...English Page 59 Note...
Страница 61: ...Page 60 Note...