![Synergy NSC CONTENDER Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/synergy/nsc-contender/nsc-contender_instruction-manual_1420742027.webp)
615-111 695mm Carbon Tail Control Rod
107-100 Ball Link
107-100 Ball Link
107-078 78mm Rod
107-078 78mm Rod
115-114 Tail Control Guide
Belt Drive Tail Push Rod & Guides
A23
Slide Tail Control Guide to approx. 265mm
from the front of the boom. Place the rear
Tail Control Guide behind Boom Support
Clamp.
106-965 Tail Push Rod Sleeve
100-310 M3x10 Socket Head
615-128 Boom Support Clamp, Lite
Approx. 5mm
Insert 78mm threaded rod approximately 62mm into
carbon tube. Use Medium CA to glue threaded rod
into carbon rod.
Содержание NSC CONTENDER
Страница 1: ......
Страница 12: ...Servo Tray Installation Do not fully tighten screws A8 100 306 M3x6 Socket Head ...
Страница 55: ...Elevator Linkage X2 A51 Approx 58 50mm 107 100 Ball Link 107 078 78mm Rod 107 100 Ball Link ...
Страница 56: ...Aileron Linkage X2 A52 Approx 107mm 107 100 Ball Link 107 100 Ball Link 107 126 126mm Rod ...
Страница 57: ...Pitch Servo Linkage A53 Approx 83mm 107 100 Ball Link 107 100 Ball Link 107 102 102mm Rod X2 ...
Страница 61: ...412 1270 ...