
19
D. ROOFTOP INSTALLATION
1. Before locating the unit on the roof, make sure that the
strength of the roof and beams is adequate at that point
to support the weight involved. This is very important
and user’s responsibility.
2. For rigging and roofcurb details, see Figures 7 and 8.
Use field-furnished spreaders.
3. For roofcurb assembly, see Roofcurb Installation Instruc-
tions.
4. If the roofcurb is not used, provisions for disposing of
condensate water runoff must be provided.
5. The unit should be placed on a solid and level roofcurb
or platform of adequate strength. See Figure 9.
6. The location of the unit on the roof should be such as to
provide proper access for inspection and servicing.
IMPORTANT:
If unit will not be put into service immediately,
cover supply and return openings to prevent excessive con-
densation.
FIGURE 7
RIGGING FOR LIFTING
ST-A1190-04
CORNER WEIGHTS BY PERCENTAGE
A
B
C
D
29%
29%
21%
26%
FIGURE 8
ROOFCURB INSTALLATION
A
B
C
D
LIFTING BEAM
CABLE OR CHAIN
SPREADER BAR
5/8” SHAKLE
EACH CORNER
ST-A1190-05
Содержание RLHL SERIES
Страница 5: ...5 LHL C120 ST A1190 11 FIGURE 2 UNIT DIMENSIONS...
Страница 6: ...6 LHL D120 ST A1190 23 FIGURE 3 UNIT DIMENSIONS...
Страница 7: ...7 LHL D120 ST A1190 24 FIGURE 4 UNIT DIMENSIONS...
Страница 23: ...23 H 2 AC Rooftop Unit w circulation pump...
Страница 26: ...26 0 1 2 34 5 666 758 9 978 1998 2 1A B C 2 D E FG7HI 2 1A B 2 J 4 2 K D E E K L L D E...
Страница 38: ...38 XXIII WIRING DIAGRAMS...
Страница 39: ...39...
Страница 40: ...40...
Страница 41: ...41...
Страница 42: ...42...
Страница 43: ...43...
Страница 44: ...44...
Страница 45: ...45...
Страница 46: ...46 RLHL C120 SYSTEM CHARGE CHART FIGURE 17 XXIV CHARGING CHART...
Страница 48: ...48 CM 0714...