
Symmons Industries, Inc.
■
31 Brooks Drive
■
Braintree, MA 02184
■
Phone: (800) 796-6667
■
Fax: (800) 961-9621
Copyright © 2018 Symmons Industries, Inc.
■
symmons.com
■
■
ZV-3018 REV G
■
101918
Installation (Thread On)
Installation (Slip Spout)
Troubleshooting Chart
Problem
Cause
Solution
Finish is spotting.
Elements in water supply may cause
water staining on finish.
Clean finished trim area with a soft
cloth using mild soap and water or a
non-abrasive cleaner and then quickly
rinse with water.
Tools Required for Installation
Allen Wrench:
5/32"
Tools Required for Installation
Plumber Tape
3-7/8"
(98 mm)
1) Male 1/2-14 NPT fitting must
protrude 3-7/8" (98 mm) from
finished wall
2) Apply plumber tape to threads on
fitting.
1
2
3) Thread tub spout (361TS or 361DTS)
onto fitting.
Min. 1-3/4" (44 mm)
Max. 2-3/4" (70 mm)
1) Rigid copper tubing must protrude
1-3/4" (44 mm) - 2-3/4" (70 mm)
from finished wall.
2) Attach tub spout (361TS or 361DTS)
to rigid copper tubing.
3) Install set screw to secure tub spout
to rigid copper tubing.
Caution:
Ensure seal is not damaged by making sure outside
of 1/2" diameter rigid copper tubing is free of burrs and
sharp edges prior to installing tub spout.