Installation Instructions: p/n 16032922-01 rev A
Page 3 of 3
BASES AND RISER FRAMES
Synchronization and Ganging Kit, continued
ErgoStat
®
Pro
9. Slide ganging straps over each pair of ball head wood
screws.
Страница 1: ...t of each ErgoStat Pro Base using a 2 Phillips screwdriver 3 Reinstall each screw with a cable manager attached on each ErgoStat Pro Base 4 Connect 10 black cable to the port labeled A2 on one of the bases Route cable alongside the leg and through the front stretcher notch of the first base Insert the cable in the cable manager locations remove minimum height minimum height Note Up to four ErgoSta...
Страница 2: ...properly initialize the synchronization of the bases press and hold the down button on the control switch of either hand control until the bases come to a com plete stop in the lowest position Release the down button and wait 2 3 seconds Then press the down button again 7 Align the top surfaces as desired Use the ganging straps to mark appropriate pilot locations near the front and back corners of...
Страница 3: ...Installation Instructions p n 16032922 01 rev A Page 3 of 3 BASES AND RISER FRAMES Synchronization and Ganging Kit continued ErgoStat Pro 9 Slide ganging straps over each pair of ball head wood screws ...