Symantec Shelf NetBackup 5220 Скачать руководство пользователя страница 33

Chapter 4 

NetBackup 5220 and Symantec Storage Shelf description 

 

Italiano

 

33 

 

 

 

Slimline bay – not operational for the NetBackup 5220. 

 

PCI Riser Assemby 

 
Control Panel 
 
LEDs and status messages, control panel 

 

NIC1 Activity 

 

NIC2 Activity 

 

Power / Sleep 

 

System Status 

 

System Identification 

 

Hard Drive Activity 

 
Diagnostic LEDs 

 

Fan Fault 

 

DIMM Fault 

 

CPU Fault 

 

5V-STBY 

 

System Status 

 

System Identification 

 

POST Code Diagnostics 

 
Power Supply  

 

Up to two 750-W power supply modules 

 
Fans 

 

Redundant fan modulc containing six system fans 

 

Two non-redundant fans per power supply 

 

System Management 

 

Integrated Baseboard Management Controller (Integrated BMC),  
IPMI 2.0 compliant 

Содержание Shelf NetBackup 5220

Страница 1: ...NetBackup 5220 and Symantec Storage Shelf Safety Guide Release 2 0...

Страница 2: ...ng No part of this document may be reproduced in any form by any means without prior written authorization of Symantec Corporation and its licensors if any THE DOCUMENTATION IS PROVIDED AS IS AND ALL...

Страница 3: ...rmation Upgrade assurance that delivers software upgrades Global support purchased on a regional business hours or 24 hours a day 7 days a week basis Premium service offerings that include Account Man...

Страница 4: ...stomer Service is available to assist with non technical questions such as the following types of issues Questions regarding product licensing or serialization Product registration updates such as add...

Страница 5: ...5 Europe Middle East and Africa semea symantec com North America and Latin America supportsolutions symantec com...

Страница 6: ...y Information 22 Product safety information 22 Safety warnings and cautions 22 Applications 23 Equipment handling practices 23 Power and electrical warnings 24 Power cord usage 24 System access warnin...

Страница 7: ...al and replacement 54 Before you begin 54 Tools and supplies 54 Unpacking the Symantec Storage Shelf 55 Symantec Storage Shelf guide rails and rack 55 Symantec Storage Shelf cover chassis 56 Chapter 8...

Страница 8: ...220 rear panel 40 NetBackup 5220 rear panel ports 41 Removing the NetBackup 5220 chassis cover 50 Chassis with cover removed 51 Tables NetBackup 5220 and Symantec Storage Shelf documentation set 10 Ne...

Страница 9: ...and equipment from injury or damage Product version The following table lists the product version related to this document Product Name Product Version NetBackup 5220 2 0 Symantec Storage Shelf 2 0 In...

Страница 10: ...ardware Troubleshooting Guide Software Troubleshooting Guide Safety Guide Maintenance Guide NetBackup 5200 Series documentation The NetBackup 5200 Series documentation has comprehensive software infor...

Страница 11: ...etBackup appliance shell menu Each command contains a brief description of the primary function of the command a synopsis and descriptions of each of the options listed in the synopsis The NetBackup a...

Страница 12: ...ve AC power from the system you must unplug each AC power cord from the wall outlet or power supply The power cord s is considered the disconnect device to the main AC power The socket outlet that the...

Страница 13: ...lock the padlock to the system to prevent unauthorized access inside the system 5 Connect all external cables and the AC power cord s to the system A microprocessor and heatsink may be hot if the syst...

Страница 14: ...e das System gesteckt wird sollte sich in der N he des Ger tes befinden und leicht zug nglich sein SICHERHEITSMASSNAHMEN Immer wenn Sie die Geh useabdeckung abnehmen um an das Systeminnere zu gelangen...

Страница 15: ...bringen Ziehen Sie diese gut an 4 Bringen Sie die Verschlu einrichtung Padlock wieder an und schlie en Sie diese um ein unerlaubtes ffnen des Systems zu verhindern 5 Schlie en Sie alle externen Kabel...

Страница 16: ...ension hors tension du panneau avant n teint pas l alimentation CA du syst me Pour mettre le syst me hors tension vous devez d brancher chaque c ble d alimentation de sa prise C est le c ble d aliment...

Страница 17: ...microprocesseur et le dissipateur de chaleur peuvent tre chauds si le syst me a t sous tension Faites galement attention aux broches aigu s des cartes et aux bords tranchants du capot Nous vous recom...

Страница 18: ...NSTRUCCIONES DE SEGURIDAD Cuando extraiga la tapa del chasis para acceder al interior del sistema siga las siguientes instrucciones 1 Apague todos los dispositivos perif ricos conectados al sistema 2...

Страница 19: ...chasis o en el tablero puede haber piezas cortantes o punzantes Por ello se recomienda precauci n y el uso de guantes protectores Existe peligro de explosi n si la pila no se cambia de forma adecuada...

Страница 20: ...sistema 2 Spegnere il sistema usando il pulsante spento acceso dell interruttore del sistema 3 Togliere tutte le spine dei cavi del sistema dalle prese elettriche 4 Identificare e sconnettere tutti i...

Страница 21: ...in modo corretto Utilizzare solo pile uguali o di tipo equivalente a quelle consigliate dal produttore Per disfarsi delle pile usate seguire le istruzioni del produttore Il sistema progettato per fun...

Страница 22: ...sons You must adhere to the guidelines in this guide and the assembly instructions in your server manuals to ensure and maintain compliance with existing product certifications and approvals Use only...

Страница 23: ...chools computer rooms and similar commercial type locations The suitability of this product for other product categories and environments such as medical industrial residential alarm systems and test...

Страница 24: ...s are present inside the power supply Return to manufacturer for servicing When replacing a hot plug power supply unplug the power cord to the power supply being replaced before removing it from the s...

Страница 25: ...ncy acceptable in your region and for U S must be Listed and rated 125 of overall current rating of the server Connector server end The connectors that plug into the AC receptacle on the server must b...

Страница 26: ...an unmovable support to prevent it from tipping when equipment is extended from it You must consider the weight of any other device installed in the rack A crush hazard serious injury exists if the ra...

Страница 27: ...cedures at an ESD workstation If one is not available provide some ESD protection by wearing an antistatic wrist strap attached to chassis ground any unpainted metal surface on your server when handli...

Страница 28: ...28...

Страница 29: ...o install the cover Verify that you have not left tools or loose parts inside the system Check that cables add in boards and other components are properly installed Attach the covers to the chassis ac...

Страница 30: ...hapter 4 NetBackup 5220 and Symantec Storage Shelf description This chapter describes the basic physical features of the NetBackup 5220 and Symantec Storage Shelf NetBackup 5220 chassis top external v...

Страница 31: ...wer TDP 4 8 GT s 5 86 GT s and 6 4 GT s Intel QuickPath Interconnect Intel QPI EVRD11 1 Memory Support for 800 1066 1333 MT s ECC registered RDIMM or unbuffered DIMM UDIMM DDR3 memory Twelve DIMMs acr...

Страница 32: ...ilot II controller with Integrated 2D Video Controller 32 MB DDR2 Memory LAN Two 10 100 1000 ports provided by Intel 82575 PHYs Expansion Capabilities optional Three full height PCI Express slots pass...

Страница 33: ...ity Power Sleep System Status System Identification Hard Drive Activity Diagnostic LEDs Fan Fault DIMM Fault CPU Fault 5V STBY System Status System Identification POST Code Diagnostics Power Supply Up...

Страница 34: ...appable they can be removed and replaced without powering down either device Other components are not hot swappable they require powering down of the entire system and devices Refer to the NetBackup 5...

Страница 35: ...ction helps you identify the components of your device You can also use the reference information provided on the inside of the chassis cover NetBackup 5220 components Letter Description A Rack Handle...

Страница 36: ...ly G Bridge Board H Control Panel I Slimline Optical Drive Bay not operational with the NetBackup 5220 at this time J Drive Tray two preinstalled not hot swappagble 2 5 hard drives K Disk Carriers qty...

Страница 37: ...Chapter 4 NetBackup 5220 and Symantec Storage Shelf description Italiano 37 NetBackup 5220 mainboard components...

Страница 38: ...CPU 1 Fan Header J Processor 1 DIMM slots qty 6 K Processor 2 DIMM slots qty 6 L Processor 2 M CPU 2 Fan Header N Memory 2 Fan Header O Bridge Board Connector P Front Panel Connector Q Fan Board Conn...

Страница 39: ...2 5 inch hard drives a tape drive CD ROM drive or DVD ROM drive The drives must be purchased separately NetBackup 5220 front Letter Description A Flex Bay Tape drive or two fixed 2 5 hard or boot disk...

Страница 40: ...that allows for maximum airflow through the server system The bezel provides a lock to secure the hard drives peripheral devices and the control panel NetBackup 5220 rear panel NetBackup 5220 rear pa...

Страница 41: ...N Video O RJ 45 Serial A Connector Rear panel ports NetBackup 5220 rear panel ports NetBackup 5220 rear panel ports Letter Name Qty Model Function A Serial port 1 RJ45 Extends functions of the OS and...

Страница 42: ...rack mounting The NetBackup 5220 should be mounted into a rack with the toolless guide rails provided with the device These rails are installed into a standard 19 inches by up to 30 inches deep EIA 3...

Страница 43: ...the top cover to add or replace components inside of the device Before removing the chassis cover power down the device and any tasks or programs that are running Then unplug all peripheral devices a...

Страница 44: ...d refer to a power supply that has shut down or locked up in order to protect itself and other components connected to the device A short circuit voltage overload or power surge can cause self protect...

Страница 45: ...based monitoring interface Alarm information Classification Type Device Description Overtemperature of the CPU core Temperature CPU Temperature is not critical yet but is approaching the upper limit o...

Страница 46: ...5220 If only one power supply is installed the power supply can be replaced if it fails or if one of the fans installed into the power supply fails The fans in the power supply module are not removab...

Страница 47: ...47...

Страница 48: ...you service the device you must first power down the device through the OS Make sure no programs or peripherals are running Then unplug all peripheral devices and the AC power cord Tools and supplies...

Страница 49: ...extenders Removing and re installing the chassis cover This section explains how to remove and re install the chassic cover of the NetBackup 5220 Removing the NetBackup 5220 chassis cover The NetBack...

Страница 50: ...the rear of the NetBackup 5220 3 Wear ESD preventive wrist straps 4 Carefully remove the NetBackup 5220 from the rack cabinet 5 Place it on a grounded ESD protective surface 6 Remove the screw on the...

Страница 51: ...p 5220 chassis cover 1 Replace the chassis cover at the top rear of the NetBackup 5220 enclosure 2 Slide the cover from the rear of the device towards the front Carefully line up both sides of the cov...

Страница 52: ...he device out of service Turn off all peripheral devices connected to the system turn off the system by pressing the power button and unplug the AC power cord from the system or wall outlet Be sure th...

Страница 53: ...3 Properly power down your NetBackup 5220 any running programs and peripherals before accessing the chassis and any baffles Always operate your device with the baffles in place to ensure proper airflo...

Страница 54: ...working with your NetBackup 5220 read and understand the safety information in this manual Note When you service the device you must first power down the device through the OS Make sure no programs o...

Страница 55: ...rack Each left and right mounting rail for the Symantec Storage Shelf is shipped as a unit The front and back of each rail slide apart a few inches to allow for precise fitting into the rack cabinet T...

Страница 56: ...is should not be opened The only front panel components that can be removed and replaced are the disk drive modules On the rear panel the two I O modules and two power supply modules can be hot swappe...

Страница 57: ...f VAC Max input AC current Max rate input AC current Voltage 110 90Vrms 100 127 Vrms 140 Vrms 85 VAC 5 VAC 75 VAC 5VAC 12Arms 1 11 0Arms3 Voltage 220 180 Vrms 200 240 Vrms 264 Vrms 6 0Arms 2 5 5Arms 3...

Страница 58: ...C per hour Humidity Non operating 90 relative humidity non condensing at 28 C Shock Operating Packaged Unpackaged 2 0 g peak 11 msec half sine Non palletized free fall in height 24 40 lbs to 80 lbs Op...

Страница 59: ...oncompliance with product regulations in the region s in which the product is sold To help ensure EMC compliance with your local regional rules and regulations before computer integration make sure th...

Страница 60: ...itability of this product for other product categories and environments such as medical industrial telecommunications NEBS residential alarm systems test equipment etc other than an ITE application ma...

Страница 61: ...ertification China GB 17625 Harmonics CNCA Certification China Product Ecology Compliance Use of banned substances are restricted t in accordance with world wide regulatory requirements A Material Dec...

Страница 62: ...USA Canada VCCI Certification Japan C Tick Declaration of Conformity Australia MED Declaration of Conformity New Zealand BSMI Certification Taiwan GOST R Certification Certification Russia Belarus Cer...

Страница 63: ...ul interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following m...

Страница 64: ...pparatus ICES 003 of the Canadian Department of Communications CE Declaration of Conformity Europe This product has been tested in accordance to and complies with the Low Voltage Directive 73 23 EEC a...

Отзывы: