9. FINAL DRIVING MECHANISM
9-11
Align the position mark on the shift spindle
sprocket with that of shift drum, and then install
shift spindle.
Install dowel pin and new gasket.
Install gear box cover and bolts, and tighten.
Torque value: 1.0~1.4kgf-m
Apply with grease onto new oil seal lip, and then
install the shift spindle oil seal.
Special tool:
Oil seal driver (14x28x7)
Install the shift spindle bracket.
Add gear oil.
Gear oil quantity: 750c.c.
Position mark
Shift spindle bracket
10 bolts
Содержание Track Runner 200
Страница 1: ...Track Runner 200 SERVICE MANUAL FORWARD HOW TO USE THIS MANUAL CONTENTS SERIAL NUMBER ...
Страница 5: ...SERIAL NUMBER Frame number Engine number Home page Contents ...
Страница 47: ...3 LUBRICATION SYSTEM 3 8 Notes To this chapter contents ...
Страница 59: ...4 FUEL SYSTEM 4 12 Notes To this chapter contents ...
Страница 87: ...7 CYLINDER PISTON 7 8 Notes To this chapter contents ...
Страница 113: ...9 FINAL DRIVING MECHANISM 9 12 Notes To this chapter contents ...
Страница 143: ...12 COOLING SYSTEM 12 14 Notes To this chapter contents ...
Страница 153: ...13 BODY COVER 13 10 Note To this chapter contents ...
Страница 167: ...14 FRONT BRAKE FRONT WHEEL 14 14 Notes To this chapter contents ...
Страница 179: ...15 STEERING SUSPENSION 15 12 Note To this chapter contents ...
Страница 197: ...16 REAR BRAKE REAR WHEEL REAR CUSHION 16 18 Note To this chapter contents ...
Страница 219: ...17 ELECTRICAL SYSTEM 17 22 Notes To this chapter contents ...
Страница 220: ...18 ELECTRICAL DIAGRAM 18 1 18 Home page Contents TRACK RUNNER 180 ELECTRICAL DIAGRAM ...
Страница 221: ...18 ELECTRICAL DIAGRAM 18 2 Notes Home page Contents ...