background image

4

Switzer operating instructions pressure switch, model PS01-W1.

O

I-P

S

0

1

-W

1

 1

1

/2

0

1

6

 

Handling prior to fi tting

– 

Check the instrument connection thread size to avoid mismatch with pressure port.

Mounting / Connection / Precaution

  1.   Position gaskets / O ring correctly while the covers are fixed. Cover mounting 

screws must be tight.

  2.  Properly seal the electrical entries and cables with correct weatherproof cable 

gland.

  3.   Do not exceed stated maximum working pressure & maximum temperature. The 

sensing element will be  permanently damaged if the applied pressure exceeds the 
maximum working pressure. 

  4.   Connected electrical load should not exceed  stated maximum electrical capacity 

in both ampere and voltage.

  5.    Do not establish pressure connection by rotating the housing. Hold the hexagon of 

the sensor with suitable spanner and tighten.

  6.   Flush the pipe system before fitting. Ensure that  no stress is produced on the 

sensor process connection and are sealed without leak.

  7.   Mount the instrument firmly and rigidly either directly on the pressure pipe line 

or on a vibration free wall, panel or pipe barrier. The instruments are for   vertical 
mounting. Any tilt may lead to set point shift.

  8.   If process temperature is higher than the 

following permissible maximum 

temperature

 it can be  brought down by using longer pressure (impulse) piping. 

 

Permissible ambient temperature

 

–10°C ... +60°C 

 

Permissible medium temperature

 

–20°C ... +110°C for SS and Buna-N 

 

–20°C ... +95°C for Neoprene

 

–20°C ... +130°C for EPDM

 

–20°C ... +200°C for Silicone

  9.  For steam application use condenser coil or a syphon
10.  For air application, use proper filters (dust  collectors) to ensure that the process 

line is not clogged with accumulation of dust / foreign particles.

11.  Ensure that suitable dampener / snubber is used in rapidly fluctuating pressure 

input.

12.  Necessary fasteners and mounting bracket are provided with the instrument for 

panel / wall / 2“ pipe mounting option.  Following items are provided

 

For panel / wall mounting  :  2 screws

 

For 2“ pipe mounting 

:  U bolt, nut, washeres and mounting bracket

2. Installation guidelines

Содержание PS01-W1

Страница 1: ...Operating instructions Pressure switch model PS01 W1 Pressure switch model PS01 W1...

Страница 2: ...Process Instruments Pvt Ltd All rights reserved Prior to starting any work read the operating instructions Keep for later use Contents 1 General information 3 2 Installation and guidelines 4 3 Electr...

Страница 3: ...with our published specification When installed and used in normal or prescribed applications with the lid in place and within the parameters set for mechanical electrical performance will not cause...

Страница 4: ...tion and are sealed without leak 7 Mount the instrument firmly and rigidly either directly on the pressure pipe line or on a vibration free wall panel or pipe barrier The instruments are for vertical...

Страница 5: ...5 Switzer operating instructions pressure switch model PS01 W1 OI PS01 W1 11 2016 3 Electrical connection The terminal blocks are suitable for 2 5 Sq mm wires Fig 1...

Страница 6: ...force which overcomes the force of a pre tensioned spring and in turn moves a balancing arm to e ect a minimal movement to actuate the microswitch Contacts gets reset when the force of the sensing ele...

Страница 7: ...result in microswitch not acting properly or result in setpoint shift Sensing of switching points Fix the instrument on to a calibrator setup with a master gauge of accuracy better than 1 to set the...

Страница 8: ...ase upper switching point and anti clockwise rotation will decrease it c The upper switching point should not exceed the maximum range value d After setting the di erential tighten the Nyloc nut to lo...

Страница 9: ...instrument only for the medium speci ed e Precaution The switch actuating screw on the balancing arm is critically adjusted Disturbance of this would result in malfunctioning while on o di erential a...

Страница 10: ...checked more frequently to ensure correct functioning Process lines are to be periodically checked for accumulation of dust foreign particles to avoid clogging Clogging would render the instrument no...

Страница 11: ...tch 88 100 47 80 2 35 28 36 20 1 2 NPTF cable ent ry Optional 21 38 57 130 100 Alu 48 SS 40 2 57 78 5 135 71 5 fixing holes 2 Nos 10 5 2 136 100 47 80 2 35 Cable ent ry 21 57 fix U clamp vertically ho...

Отзывы: