![SwitchDin SA Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/switchdin/sa/sa_quick-reference-manual_1415575005.webp)
Document Number: QRG-SMA-1 Quick Reference Guide
Revision: Issue 1.0
5.2.
SMA Energy Meter (ONLY FOR OPTION 2)
6.
Scroll down and look for SMA
Speedwire Energy Meter
7.
Click “Select meter role to…“ dropdown
list and select
7.1.
Grid meter role
–
for grid meter
configuration
7.2.
Load meter role
–
for load meter
configuration
8.
Click the configure button (blue
hammer and spanner)
For Load meter role -
proceed to step 5.3.7
5.3.
Eastron Meter
Complete the following steps to configure the meter.
1.
Click “+” on the USB port number where the
meter comms cable is connected.
2.
Then select “
Eastron
” from the device list.
3.
Select the correct Eastron meter for your
installation (single or three-phase)
4.
Click back in the top left corner