![SwitchBee 1-M-SSR Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/switchbee/1-m-ssr/1-m-ssr_settings-manual_1415558007.webp)
1-SW-R16-D
Power switch control module:
Connect the live wire into
LIN
,
and the return or load into
L1
.
Connect the neutral wire into
N
.
(In some boiler switches there
are 2 neural wires).
The power switch control
module MUST have a neutral
wire connected!
1-M-SSR
Motor control module:
Connect Live to
LIN
,
Motor-Down to
L1
,
Motor-Up to
L2
.
2-M-SSR
2 Motor - control module:
Connect Live to
LIN
,
Motor1-Down to
D1
,
Motor1-Up to
U1
, Motor2-Down
to
D2
,
and Motor2-Up to the
red wire
.
If there is no neutral bridge
U2
to
N
, just like
3-M-SSR
(Op�on 2)
If there is a neutral wire present, we recommend to connect it to
N
.
Содержание 1-M-SSR
Страница 1: ......
Страница 16: ...info switchbee com www switchbee com Technical guidelines by Simchi ...