35
STEP 23
1.
Locate the PF 6019 Swing Beam in your kit.
2.
Using your HD Swing Hanger as a guide, mark six hole locations as shown.
3.
Using the 3/8’’ x 6’’ Drill Bit included, drill six holes. These will allow the installation of the (6) Heavy Duty Swing
Hangers included in your kit.
NOTE:
Make certain to attach swing hangers on the same side that you drilled from. This will ensure proper
alignment.
4.
Attach Heavy Duty Swing Hangers as shown.
A-FRAME
THIS SIDE
BOTT
OM VIEW
= DRILL HERE (6 PLACES)
CENTER
5/16” Washer
5/16” Clamp,
Beam
5/16”
Loc Nut
5/16”-18 x 6-1/2”
Carriage Bolt
HD Swing
Hanger
30mm
Deck Screw
(4 per Clamp)
PF 6019
2-11/16’
’x5-3/8’
’x93’
’
Swing Beam
NOTE HOLE
LOCA
TIONS
SIDE VIEW
NOTE HOLE
LOCA
TIONS
MARK HOLE
LOCATION
PF 6019
2-11/16’’x5-3/8’’x93’’
Swing Beam
TOWER
THIS SIDE
TO
W
ER
THIS SIDE