13
STEP 3
1. Attach support board to Frame 1 as shown.
Check to make sure
structure is square
FRAME 1
(3) 1-1/4” Lag & (2) 2” Lag
per 2x4 Shelf Loc bracket
[PF 4944] 2’
’ x 4’
’ x 47-1/2’
’
FLIP
FRAME
OVER
2” Lag Screw (x4)
1-1/4” Lag Screw (x6)
47-1/2’
’
FLUSH