63
FINAL INSPECTION
!IMPORTANT! Inspect and confirm
tightness of all Lock-Nuts and
Quick Links.
Quick Link
x4
Chain End Link
Tighten clips securely with a wrench.
8” minimum between Glider and ground. Adjust Chains at Top.
8” minimum between Glider and ground. Adjust Chains at Top.
Glider Chain
!IMPORTANT! Attach (2) Chains per
Swing Hanger using quick links
1.
Finish Two child Swing assembly as shown.
STEP 50