30
PB 8242 -PB 8244
T. Install Tarp.
1.
Install canopy as shown in
(Fig. 30)
2.
Secure canopy in six locations
(Fig. 30a)
.
1-1/4'' screw
Fig. 30
Fig. 30a
Страница 1: ...lide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS check out http www swing n slide com planupdates htm for updates to these instructions For more information visit this link http www swing n slide com No of Children Up to 10 Min Use Zone 26 x 28 Set Dim 14 W x 14 L x 11 H Est Building Time 3 6 hr 28 26 ...
Страница 2: ...y cause a strangulation hazard Not to use equipment in a manner other than intended Not to get off equipment while it is in motion Not to climb on the equipment when it is wet Determined that only one child per planned occupant seat should be allowed on this set at one time Determined children must be dressed appropriately for play Avoid clothing with draw strings and loose fitting clothes which c...
Страница 3: ...en residencias y hogares privados Para protegerse de caídas de hasta 9 pies de altura 2 742 m recomendado para los equipos Swing N Slide MATERIALES DE RELLENO SIN COMPRIMIR DE 1 PULGADA 25 4 MM DE PROFUNDIDAD Mezcla de madera 9 pulgadas 229 mm Mezcla de corteza de doble trituración 9 pulgadas 229 mm Viruta de madera uniforme 12 pulgadas 305 mm Arena Fina 12 pulgadas 305 mm Grava fina 12 pulgadas 3...
Страница 4: ...ashers 2 1 4 flat washers 6 T nuts 2 1 2 panhead screws 2 1 3 4 panhead screws 2 3 1 2 Bolts 224 2 1 2 screws 44 1 1 2 screws 7 1 Truss Screw 105 2 lag screw KIT CONTENTS ELECTRIC DRILL 1 2 SOCKET WRENCH HAMMER TAPE MEASURE SAFETY GLASSES DUST MASK PHILLIPS BIT CARPENTER S SQUARE TOOLS REQUIRED ...
Страница 5: ...tial Use ONLY 1212 Barberry Drive Janesville WI 53545 1 800 888 1232 www swing n slide com PROCESS BLACK PANTONE NEWCO RED R R R 1 Name Plate 1 T30 Torx Bit 2 EZ Frame Brackets 1 Instructional DVD 1 Canopy 3 8 DRILL BIT 5 Min 8 Climbing Rocks With Hardware 1 T20 Torx Bit 4 Shelf Loc 8 Wrap Loc 2 Split Beam bracket 8 Cup Loc 1 Plan PB 8242 PB 8244 Plan ...
Страница 6: ...1 Safety Handle 1 Summit Slide with hardware 1 Cliff Climber 1 Periscope With Hardware 1 Steering Wheel With Hardware 1 Disc Swing With Hardware 1 Pirate s Ladder with hardware 4 Anchor It With Hardware 4 Anchor It Straps ...
Страница 7: ... 3 4 1 5 4 x 4 x 17 1 5 4 x 4 x 46 1 2 14 5 4 x 4 x 47 1 2 6 5 4 x 6 x 30 9 5 4 x 6 x 40 1 2 11 5 4 x 6 x 47 1 2 4 4 x 4 x 39 3 4 1 4 x 4 x 47 1 2 2 5 4 x 4 x 34 PLASTIC COATED LUMBER 9 4 x 4 x 96 NOTE 1 Swing Beam and 1 Accessory Board have pre drilled holes Board List ...
Страница 8: ...4 screws when mounting 5 4 boards to 5 4 x4 boards How to select the correct fastener Use these 3 pictorial guides to help select the correct fastener s for the lumber attachment you are making Each diagram will highlight the correct number of fasteners to use and where to attach them 5 4 Boards to 4 x 4 5 4 Boards to 5 4 Boards ...
Страница 9: ...other NEVER position in a non interlocking position Top of bracket Bottom of bracket Hole locations close to bottom Example of a Shelf Loc bracket connection Wrap Loc Shelf Loc Bracket 1 2 3 4 Wrap Loc CORRECT WRONG Brackets Clip Together brackets NOT interlocked Brackets clipped Example of a Cup Loc bracket connection TOP Look for TOP stamp on bracket for correct orientation ...
Страница 10: ...Frame Construction 1 Measure and position brackets on 4 4 x 4 x 96 as shown in Fig 1 Fig 2 x 8 4 each bracket 2 Lag screw Fig 1 REMEMBER Brackets are inter locking Cup loc will clip and secure into the Wrap Loc as shown below BEND WRAP BRACKETS TO FIT AROUND 4 x 4 s AS SHOWN IN A B A B ...
Страница 11: ...own in Fig 4 82 1 2 Frame 1 Frame 1 Frame 1 Construction WARNING Avoid splitting your lumber by offsetting your screws at least 3 4 from edge 2 1 2 screw 3 2 1 2 screws per joint 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 Screws must be vertically aligned to pass through the gap in the Wrap Loc Brackets 2 2 lag screws Per Bracket 2 Lag screw Double check to make sure structure is square FLIP FRAME OVER GAP...
Страница 12: ...and lower 5 4 boards as shown in Fig 6 Fig 5 Fig 6 3 2 1 2 screws per joint 2 1 2 screw 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 82 1 2 Screws must be vertically aligned to pass through the gap in the Wrap Loc Brackets WARNING Avoid splitting your lumber by offsetting your screws at least 3 4 from edge 2 2 lag screws Per Bracket 2 Lag screw Double check to make sure structure is square FLIP FRAME OVER GA...
Страница 13: ...ll 5 4 boards as in Fig 7 2 Install Frame 2 as shown in Fig 8 Fig 7 Frame 1 3 2 1 2 screws per joint 2 1 2 screw 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 Fig 8 Frame 1 Frame 2 3 2 1 2 screws per joint Double check to make sure structure is square ...
Страница 14: ...14 PB 8242 PB 8244 14 2 Lag screw x 3 Fig 9a A Frame Construction cont 1 Install 4 x 4 beams as shown in Fig 9 2 Install lag screws at each corner location as shown in Fig 9a Fig 9 4 4 x 4 x 39 3 4 ...
Страница 15: ...5 4 x 6 x 40 1 2 deck boards as shown in Fig 10 2 Attach 2 x 4 x 40 1 2 to deck boards using 2 1 2 screws as shown in Fig 10a 2 1 2 screw Fig 10a 19 1 2 2 2 1 2 screws per joint 2 2 1 2 screws per joint Fig 10 5 4 x 6 x 40 1 2 2 x 4 x 40 1 2 5 4 x 6 x 40 1 2 ...
Страница 16: ...tall 6 additional 5 4 x 6 x 47 1 2 deck boards to structure as shown Fig 11 2 Use two 2 1 2 screws at center and each end of deck boards Note Screws at center will attach to center support 2 1 2 screw Fig 11 2 2 1 2 screws per joint 6 5 4 x 6 x 47 1 2 ...
Страница 17: ...Install Lower Rail Boards 1 Install lower rail support as shown in Fig 13 Fig 12 Fig 13 3 2 1 2 screws per joint 6 2 1 2 screws per board 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 5 4 x 4 x 20 3 4 5 4 x 4 x 20 3 4 30 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 5 2 1 2 screws 5 2 1 2 screws ...
Страница 18: ...Fig 15 Approx 1 4 2 Lag screw x 4 F Install Accessory 4x4 1 Work 4 x 4 into brackets as shown in Fig 14 and Fig 15 2 Secure brackets Fig 16 Fig 16 4 x 4 x 47 1 2 Fig 14 Tip Flex brackets to make installation of 4 x 4 easier ...
Страница 19: ...l Locations 1 Identify your Swing Beam by finding the predrilled holes as pictured in Fig 17 2 Tap T nut into swing beam at locations shown 3 1 2 10 1 2 10 1 2 24 1 2 33 1 2 47 1 2 58 63 1 2 93 1 2 14 9 14 10 1 2 5 1 2 30 96 DISC SWING MOUNTS HERE ...
Страница 20: ...m and thread it into the T nut until it is flush or near flush with the top of the T nut A screwdriver may be used to twist the hanger Fig 18 Orient swing hanger as shown in Fig 18 4 Use 4 1 1 4 screws to secure beam clamp 5 Check hanger to ensure it does not spin 6 Repeat for all swing hangers 4 1 1 4 screws Swing Hanger Use Screwdriver to aid in tightening Bottom Beam Clamp t nut Hammer 3 8 hole...
Страница 21: ...A Frame Assembly 1 Layout 4 x 4 s and 2 x 4 as shown in Fig 19 and Fig 20 2 Allign EZ Frame Bracket with face of 4 x 4 s 3 Secure EZ Frame Bracket with 8 2 1 2 screws to 4 x 4 s making sure they are flush with each other 4 Secure 2 x 4 to 4 x 4 s as shown in Fig 20 5 Flip over and add 2nd bracket Repeat steps 2 through 4 8 2 1 2 Screws 4 2 1 2 screws 4 2 1 2 screws 2 1 2 screw ...
Страница 22: ...tilever beam T nut 2 1 2 screws Hex Bolt Washer K A Frame Assembly cont 1 Attach A Frame beam to Swing Beam using 2 hex bolts and 4 screws 2 Tighten hex bolt to flush with top of T nut Repeat on other bracket Fig 21 2 1 2 screw ...
Страница 23: ...ew x 8 each bracket 22 L Swing Beam Assembly 1 Position Split Brackets on 4 x 4 x 47 1 2 Fig 22 2 With the help of others lift A Frame and Swing Beam Assembly and center onto unit as shown in Fig 22 3 Secure as shown in Fig 23 Fig 22 Swing Beam Swing Beam ...
Страница 24: ...PB 8244 24 1 1 2 screw 2 1 2 screw N Barrier Boards 1 Install 5 4 barrier boards evenly spaced in the opening Use 2 1 2 screws to secure to 5 4 x 4 to 4 x 4 Fig 24 5 5 4 x 6 x 47 1 2 2 1 1 2 deck screws per joint ...
Страница 25: ...25 PB 8242 PB 8244 25 O Barrier Boards cont 2 Install 5 4 x 30 barrier boards evenly spaced in the opening See Fig 25 Fig 25 2 5 4 x 6 x 30 2 5 4 x 6 x 30 2 1 1 2 deck screws per joint 1 1 2 screw ...
Страница 26: ...6 PB 8242 PB 8244 26 Fig 26 O Barrier Boards cont 3 Install 5 4 x 30 barrier spaced to create an opening as shown in Fig 26 5 4 x 6 x 30 1 1 2 2 1 1 2 deck screws per joint 1 1 2 screw 5 4 x 6 x 30 1 1 2 ...
Страница 27: ...27 PB 8242 PB 8244 27 Fig 27 3 1 2 60 96 70 80 90 60 10 10 10 H Accessory Beam Drill Locations 1 Identify your Accessory Beam by the predrilled holes as pictured in Fig 27 ...
Страница 28: ...a Approx 1 4 2 Lag screw F Install Accessory 4x4 1 Work 4 x 4 into brackets as shown in Fig 28 Fig 28a 2 Secure brackets Fig 28b 3 Attach accessory 4 x 4 to base board as shown in Fig 28 Fig 28b Fig 28 4 x 4 x 96 Note Drill Holes in 4 x 4 before mounting x 4 4 x 4 x 96 4 2 lag screws ...
Страница 29: ...Support 1 Install 5 4 x 4 boards as shown in Fig 29 Fig 29 5 4 x 4 x 46 1 2 5 4 x 4 x 34 5 4 x 4 x 34 1 Connect 5 4 x 4 x 34 to center 5 4 x 6 fence panel 2 Align 5 4 x 4 x 34 with opposite 5 4 x 4 x 34 2 2 1 2 screws per joint 3 2 1 2 screws ...
Страница 30: ...30 PB 8242 PB 8244 30 T Install Tarp 1 Install canopy as shown in Fig 30 2 Secure canopy in six locations Fig 30a 1 1 4 screw Fig 30 Fig 30a ...
Страница 31: ...31 PB 8242 PB 8244 31 30 U Install Protective Barrier Board 1 Secure protective 5 4 barrier board as shown in Fig 31 2 1 2 screw Fig 31 5 4 x 4 x 47 1 2 3 2 1 2 screws ...
Страница 32: ...2 3 8 Holes 2 T nuts Hold rock 2 1 1 2 Hex Head Bolts 1 Loc Washer per bolt 1 Flat Washer per bolt Fig 32b WARNING Verify Rock Hardware BEFORE Drilling Holes Climbing Rock Installation 1 Mark locations of Climbing Rocks on the Climbing Wall in a pattern that will easily allow your child to climb to the deck Make sure the bolt hole locations are clear of wall supports before drilling 2 Drill holes ...
Страница 33: ...ons using 1 5 16 x 3 4 head bolt 1 5 16 loc nut and 2 5 16 flat washers at each location See Fig 33 2 Position slide to determine proper location for stake 3 Drive wood stake into ground leaving 2 exposed 4 Secure the slide bottom to the stake using 2 1 1 4 deck screws Fig 33a 5 Attach slide to unit as shown in Fig 33b Fig 33a 2 Above Ground 2 1 1 4 screws per joint 5 4 x 4 x 17 ...
Страница 34: ...to tower at the 5 locations where holes are drilled through the Cliff Climber on the side top 2 Attach Cliff Climber to the bottom rail through 3 holes in the bottom lip as shown in Fig 33c Fig 33c 3 1 Truss Screw Use truss head screws to secure climber to unit 5 2 Lag screw ...
Страница 35: ...that it fits at the top of the V hanger Insert uncoated chains to bottom vinyl hooks of V hanger Fig 36 Crimp harness end closed CAUTION It is important that you crimp harness ends completely closed before using see Fig 36 Place end of harness with hooks on a hard surface and force hooks closed with a hammer or squeeze closed with a pliers until parts are touching WARNING Open hooks can cause deep...
Страница 36: ...the base and near the corners of your activity center at the bottom of the legs on swing sets and twist the auger style stakes into the ground until only the loop is exposed 3 Place the metal strap through the loop of the Anchor It stake and secure it to the unit with a lag screw and washer as illustrated to the right Note Attach the strap to the unit with as little play as possible using whatever...
Страница 37: ...each as shown in Fig 39a 3 Using two rope staples to secure the bottom of each Pirate s Ladder rope Tap two staples in place approximately 1 apart Wrap the rope under the 4 x 4 Then thread the rope through both staples Double the rope back on itself and through the first staple Pull the rope tight and secure in place by pounding staples in place See Fig 39b 4 Secure end of each rope to 4 x 4 using...
Страница 38: ...the eye bolt through the hole and secure it with a 3 8 flat washer and loc nut Place a bolt cover over the exposed bolt end and secure it using two 1 1 4 screws as shown in Fig 1 Deck Surface 11 washer 1 3 4 Panhead screw Fig 2 V Safety Handles 1 Mount safety handle in the Cliff Climber opening approximately 11 above the deck surface Fig 2 2 Reference Fig 33c for Cliff Climber assembly ...
Страница 39: ...u will need to counterbore the hole appropriately 2 Mount steering wheel to climbing unit as indicated in Fig 1 3 Snap steering wheel cap into place Fig 1 Fig 1 Installation Instructions 1 Position mounting bracket in desired location as indicated 2 Attach mounting bracket to the unit using four mounting screws provided 3 Insert the Periscope into the mounting bracket as shown Note The periscope s...
Страница 40: ... PlayCore Inc 2007 Printed In USA LA 5596 Questions Call our Customer Service Department at 1 800 888 1232 ...