background image

This product is intended for single family home/residential use only and not intended for use in any public setting.

Placement in any public setting constitutes a misuse of this product.

IMPORTANT

!

ADDITIONAL REQUIRED SAFETY INSTALLATION INSTRUCTIONS

According to ASTM requirements, all kits must be anchored to the ground and, if the unit has a climbing rope, the rope end must be anchored to the ground. If soil conditions
permit stakes to be pulled out easily, cementing into ground is necessary.

• To anchor the unit to the ground,

Follow the instructions included in this plan for applying Anchor-It devices to your unit, or use 2" x 4" x 18" (45mm x 95mm x 457mm) pressure-

treated stakes. Pound stakes into ground at least 12" (305mm) at all inside corners of the posts (including A-frame legs and climbing unit posts). Attach with four (4) 16D (3-1/2")
galvanized nails per stake into each 4" x 4" (95mm x 95mm) post.

• If the unit has a climbing rope,

anchor the rope end.

• Once the unit is completely assembled and before children are allowed to play on it, proper shock-absorbing surfacing material must be installed.

This may be accomplished by

using loose-fill materials at a sufficient depth. The Consumer Product Safety Commission “Handbook for Public Playground Safety” lists the following materials and required
depths that are sufficient for home/residential application. For fall height protection up to 9 ft. (2.742m) [recommended for Swing•N•Slide kits]:

LOOSE FILL MATERIAL

REQUIRED (UNCOMPRESSED) DEPTH

1

in. (mm)

Wood Mulch

9" (229mm)

Double Shredded Bark Mulch

9" (229mm)

Uniform Wood Chips

12" (305mm)

Fine Sand

12" (305mm)

Fine Gravel

12" (305mm)

These depths were derived from the CPSC Handbook. Swing•N•Slide has not done independent tests to determine these required depths.

When properly installed, shock absorbing material will completely cover the horizontal baseboards on climbing units. This protective surfacing must extend a

minimum

of 6 ft.

(1.828m) in all directions from the perimeter of the equipment or from the outermost edges of any component. For example, a slide extending beyond the platform must have
protective surfacing at least 6 ft. (1.828mm) out from both sides as well as the end. For swings, the protective surface must extend

at least 14 ft. (6m)

out from

both

the back and

front of the swing when the swing is in its rest position.

Notes:

3

Содержание PB 8232

Страница 1: ...e at www swing n slide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS check out http www swing n slide com planupdates htm for updates to these instructions No of Children Up to 5 Min Use Zone...

Страница 2: ...not limited to jump ropes clotheslines pet leashes cables and chain They may cause a strangulation hazard Not to use equipment in a manner other than intended Not to get off equipment while it is in...

Страница 3: ...acing material must be installed This may be accomplished by using loose fill materials at a sufficient depth The Consumer Product Safety Commission Handbook for Public Playground Safety lists the fol...

Страница 4: ...ENTER S SQUARE TOOLS REQUIRED 1 T30 Torx Bit 1 T20 Torx Bit 4 178 2 1 2 Wood Screw 18 1 1 4 Wood Screw 16 2 Lag Screw 3 1 Truss Head Screw 6 5 16 x 3 1 2 Hex Head Bolt 10 T Nut 4 Slotted Beam Clamp 10...

Страница 5: ...2 Barberry Drive Janesville WI 53545 1 800 888 1232 www swing n slide com R 1 Name Plate PineBluff Plan 1 Plan 4 Anchor It Straps 4 Anchor It 5 2 EZ Frame Brace R 2 EZ Frame Brace L 2 Swing Seat weigh...

Страница 6: ...TELY 1 4 x 4 x120 120 English Metric Cm English Metric Cm 1x4 2 5x7 6 3 4x3 1 2 1 9x9 1x6 2 5x15 3 3 4x5 1 2 1 9x14 5 4x4 3 2x10 2 1x3 1 2 2 5x9 5 4x6 3 2x15 3 1x5 1 2 2 5x14 2x2 5x5 1 1 2x1 1 2 3 8x3...

Страница 7: ...re making Each diagram will highlight the correct number of fasteners to use and where to attach them PlineBluff Assembly Instructions 7 2 2 1 2 screws Use 2 screws when mounting 5 4 boards to 2 x4 bo...

Страница 8: ...4 5 0 1 2 94 1 2 2 x 4 x 47 1 2 2 x 4 x 23 1 2 3 2 1 2 screws per joint Frame Assembly 1 Install 2 x 4 boards as shown in Fig 1 NOTE Double check your measurements to make sure the structure is squar...

Страница 9: ...4 5 3 4 8 1 2 5 4 x 6 x 35 DETAIL VIEW UNIT ROTATED 180 3 2 1 2 wood screws per joint Fig 2a Double check to make sure structure is square 2 2 1 2 screws per joint 2 2 1 2 screws per joint Install Fr...

Страница 10: ...Bluff Assembly Instructions 10 Platform Assembly 1 Lift second half of Platform and secure in place in 4 locations as shown in Fig 3 3 2 1 2 wood screws per joint 2 1 2 Wood Screw 2 2 1 2 wood screws...

Страница 11: ...ly Instructions 11 8 5 4 x 6 x 28 NOTE There must be a 1 2 Nominal Gap between all deck boards 2 1 2 Wood Screw Install Deck 1 Install Deck boards evenly spaced with a 1 2 Gap as shown in Fig 4 2 2 1...

Страница 12: ...ig 5 PineBluff Assembly Instructions 12 5 5 4 x 6 x 35 17 2 1 2 Wood Screw 3 2 1 2 wood screws per joint Install Rock Wall Rungs 1 Install 5 4 x 6 Rock Wall Rungs as shown in Fig 5 25 1 2 34 42 1 2 51...

Страница 13: ...3 8 13 7 8 37 3 8 16 51 1 4 1 7 8 112 5 8 5 1 2 86 5 8 26 81 1 8 5 1 2 67 1 4 16 13 7 8 13 7 8 118 1 8 Hole Locations Platform Swing Seat Swing Seat A Frame A Frame A Frame Swing Beam Hole Locations...

Страница 14: ...eam and thread it into the T nut until it is flush or near flush with the top of the T nut A screwdriver may be used to twist the hanger Fig 7 Orient swing hanger as shown in Fig 7 4 Use 4 1 1 4 screw...

Страница 15: ...cket with face of 4 x 4 s 3 Secure EZ Frame Bracket with 8 2 1 2 screws to 4 x 4 s making sure they are flush with each other 4 Secure 2 x 4 to 4 x 4 s as shown in Fig 8a 5 Flip over and add 2nd brack...

Страница 16: ...x Bolt A Frame Assembly cont 1 Attach A Frame to Swing Beam using 2 hex bolts and 4 screws as shown in Fig 9 2 Tighten hex bolt to flush with top of T nut Repeat on second bracket 3 Repeat steps 1 2 t...

Страница 17: ...ly Instructions Fig 11 Install EZ Frame Braces 1 Install 2 EZ Frame Braces per side of the units as shown in Fig 11 2 Lag Screw 2 1 2 Wood Screw 4 2 Lag Screws AND 4 2 1 2 wood screws per Brace 2 Brac...

Страница 18: ...exposed 3 Place the metal strap through the loop of the Anchor It stake and secure it to the unit with a lag screw and washer as illustrated to the right Note Attach the strap to the unit with as lit...

Страница 19: ...ted chains to bottom vinyl hooks of V hanger Fig 16 Crimp harness end closed CAUTION It is important that you crimp harness ends completely closed before using see Fig 17 Place end of harness with hoo...

Страница 20: ...g Rocks as shown in Fig 18 3 Make sure the Climbing Wall and Climbing Rock connections are secure before allowing any children to play on the Climbing Wall Note Refer to Page 12 Fig 5 for Rock Wall co...

Страница 21: ...mbly Instructions 21 Deck Surface 1 4 washer 1 3 4 Panhead screw Fig 19 Safety Handle 1 Mount safety handle in the climber openings approximately 11 above the deck surface Fig 19 Safety Handle 1 3 4 P...

Страница 22: ...PineBluff Assembly Instructions 22...

Страница 23: ...PlineBluff Assembly Instructions 23...

Страница 24: ...PlayCore Inc 2009 Printed In USA LA 6048 Questions Call our Customer Service Department at 1 800 888 1232 R...

Отзывы: