Swing-N-Slide NE 4680-T Скачать руководство пользователя страница 13

13

Twister Tube Assembly Instructions

H. Slide Installation.

1.

Position slide to determine proper location for stake.

2.

Drive wood stake into ground leaving 2'' exposed.

3.

Secure the slide bottom to the stake using (2) 1-1/4'' deck screws.

(Fig. 8)

.

2'' A

bov

e G

rou

nd

(2)

1-1/4'' screws

2'' x 4'' x 17''

Fig. 8

Содержание NE 4680-T

Страница 1: ...ide 1212 Barberry Drive Janesville Wisconsin 53545 Visit our web site at www swing n slide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS check out http www swing n slide com for updates to th...

Страница 2: ...not limited to jump ropes clotheslines pet leashes cables and chain They may cause a strangulation hazard Not to use equipment in a manner other than intended Not to get off equipment while it is in...

Страница 3: ...acing material must be installed This may be accomplished by using loose fill materials at a sufficient depth The Consumer Product Safety Commission Handbook for Public Playground Safety lists the fol...

Страница 4: ...deck screws 12 2 deck screws 44 2 1 2 deck screws HARDWARE PURCHASED SEPARATELY LUMBER PURCHASED SEPARATELY Note To match the wood appearance on your playset make certain to use the precise Wood Stai...

Страница 5: ...d no 2 1 Entrance Section marked no 1 1 Slide Base marked no 6 1 90 Sections w o flange marked no 3 1 Exit Section marked no 5 1 Support Bracket 5 HARDWARE INCLUDED 98 5 16 flat washers 12 1 1 2 lag b...

Страница 6: ...ain hole alignment 1 Identify each slide section as either 1 2 3 5 or 6 as marked on the lip of each piece 2 Assemble entrance section using pieces 1 2 one 90 section using pieces 3 5 Join sections us...

Страница 7: ...you will need it in the following steps 2 Install 2 2 x 4 Barrier Support Boards as shown in Fig 2a making certain the opening between them is 28 3 To fill the gap created above the top 2 x 4 re inst...

Страница 8: ...tall 2 2 x 4 x 23 1 4 Slide Support Boards on the inside of your barrier as shown in Fig 3b Fig 3a INSIDE VIEW UNIT WAS ROTATED 180 FOR THIS VIEW 3 1 x 4 x 33 2 1 2 Gap Between Each Barrier Board 2 x...

Страница 9: ...Align the mounting panel to the previously assembled entrance section Fig 4 Attach the mounting panel to the entrance section at the hole locations indicated in Fig 4a using one 1 bolt two washers an...

Страница 10: ...of Section A E SLIDE ASSEMBLY 1 Attach the Run Off Section to the Exit Section as shown in Fig 5 using 6 3 4 Hex Head Bolts 12 5 16 Washers and 6 Loc Nuts 2 Connect the Exit Section to the Entrance Se...

Страница 11: ...Slide In Place 1 Attach Twister Tube Slide to your prepared entrance as shown in Fig 6 1 1 2 Lag Bolt 3 1 1 2 Lag Bolt 3 1 1 2 Lag Bolt 1 2 1 2 Lag Bolt 2 1 1 2 Lag Bolt 2 1 1 2 Lag Bolt 1 2 1 2 Lag B...

Страница 12: ...BLY 1 Assemble the support base as shown in FIG 7 2 Attach the support bracket to the support base using two 1 1 2 lag bolts FIG 7a NOTE Pre drill 1 8 pilot holes 3 Place the support beneath the slide...

Страница 13: ...lide Installation 1 Position slide to determine proper location for stake 2 Drive wood stake into ground leaving 2 exposed 3 Secure the slide bottom to the stake using 2 1 1 4 deck screws Fig 8 2 Abov...

Страница 14: ...14 Twister Tube Assembly Instructions...

Страница 15: ...15 Twister Tube Assembly Instructions...

Страница 16: ...PlayCore Inc 2009 Printed In USA LA 6066 Questions Call our Customer Service Department at 1 800 888 1232 R...

Отзывы: