10
PROJECT 512
(2)
2'' lag screws
per bracket
A. Frame 1 Construction
1.
Measure and position brackets on
4'' x 4'' x 96’’ as shown in
(Fig.1)
.
2.
Attach upper 2'' x 4'' and lower 5/4''
boards as shown in
(Fig. 1)
Note:
Secure Shelf Lock with
(2) Lag Screws
only
at this time.
Frame
1
Frame 1
Use a 2’’ lag screw
to hold bracket in
place for later use.
Look for ‘’TOP’’
stamp on brackets
while installing.
TO
P
GAP on
this side
Fig.1
47''
(2) 4'' x 4'' x 96''
Frame 1 Construction
2'' x
4'' x
54''
2'' x
4'' x
54''
5/4''
x 6''
x 54''
74-1/2''
86''
•WARNING•
Avoid splitting your
lumber by offsetting
your screws at least
3/4’’ from edge.
2'' Lag screw
(4) 2-1/2'' screws
(1) 2'' lag screws
(3)
2-1/2'' screws
per joint
2-1/2'' screw