background image

2

ROW

Swegon reserves the right to alter specifications. 

20140116 

www.swegon.com

Installation with the ALV 

1. Cut an opening in the wall according to the dimensions 

specified in the dimension table and the dimension 
print. Place the ALV commissioning box in the opening. 
Insert the mounting frame into the commissioning box 
and secure it with screws in the short sides through 
the sides of the commissioning box and into the wall 
structure. 

2. Insert the measurement hose and the cord for damper 

adjustment through the air distribution plate in the 
mounting plate and press it into the mounting frame. 
The mounting frame is held in place by its spring 
retainers. Mark the positions for the bore holes. 

p

q

 ROWb 400 -150

Tomelilla

Sweden

+ALVd 400-150-125
k-faktor

B-ansl 10,0 / K-ansl 9,9

k

p

q

=

k

p

q

=

(    )

2

= uppmätt flöde l/s  

p

 = aktuellt mättryck (Pa)

k

 = injusteringsfaktor

k

k-faktor

p

q

 ROWb 400 -150

Tomelilla

Sweden

+ALVd 400-150-125
k-faktor

B-ansl 10,0 / K-ansl 9,9

k

p

q

=

k

p

q

=

(    )

2

= uppmätt flöde l/s  

p

 = aktuellt mättryck (Pa)

k

 = injusteringsfaktor

k

k-faktor

Figure 2. ROW + ALV.

3. Bore screw holes in the wall. 

4. Secure the mounting plate with screws to the wall. 

5. Commissioning is carried out with the wall terminal 

face temporarily secured with the screws supplied. See 
Commissioning. 

6. Bore the screw holes in the mounting plate for the 

temporary attachment using a 5.5 mm twist drill. The 
measurement hose and the commissioning cord can 
be removed, if necessary, by cutting them off, level 
with the air distribution plate. Or they can be pushed in 
behind the air distribution plate. 

7.  Secure the wall terminal face using steel blind rivets. 

Q =Flow reading
P = Current pressure reading
K = Commissioning factor

Отзывы: