SL-105.OPE
3-1
07/2009
OPERATING INSTRUCTIONS
During all operations of the SwapLoader, the speed of the engine should be maintained at 1,000
to 1,200 RPM, assuming the ratio of the Power Take Off is about 100%.
LOADING A CONTAINER
1.
Engage the P.T.O. (Refer to P.T.O. manual for operation).
2.
Retract the jib (right control lever backward). Then, tilt the arm backward (left control
lever backward).
3.
Make sure the work area in front of the container is clear of people and obstacles. Move
the truck backwards until the hook engages the curved lifting bar of the container.
NEVER EXTEND THE JIB
to reach the proper catching height, rather tilt the arm.
RAISE/UNLOAD
LOWER/LOAD
JIB
RETRACT
EXTEND
LIFT
FRONT
Содержание SL-105
Страница 1: ...Model SL 105 Parts and Operations Manual Hoist Serial Number ____________________ ...
Страница 7: ...INTRODUCTION ...
Страница 14: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Страница 15: ...INSTALLATION ...
Страница 38: ......
Страница 39: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Страница 47: ...10 05 09 ...
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 54: ...OPERATION ...
Страница 59: ...MAINTENANCE ...
Страница 61: ...SL 105 MAI 4 2 07 2009 ...
Страница 73: ...PARTS LIST ...
Страница 74: ...12H55 SL 105 SWAPLOADER HOIST BASE ASS Y 3 2 1 1 3 5 2 ...
Страница 75: ...12H53 SL 105 MAINFRAME SUB ASSEMBLY 5 6 9 4 2 10 11 6 13 1 5 7 8 13 1 6 11 8 7 5 3 12 12 3 ...
Страница 76: ...12H61 SL 105 PIVOT JOINT SUB ASSEMBLY 3 6 9 2 12 4 5 11 15 10 8 7 15 11 5 10 8 7 3 14 9 6 2 13 4 12 1 ...
Страница 78: ......
Страница 85: ...OPTIONS ...
Страница 88: ...HOIST INSTALLATION KIT EHV SL 105 12H79 ...
Страница 89: ...EHV SUB ASS Y PUMP CIRCUIT 100 SERIES 91H22 ...
Страница 90: ...EHV SUB ASS Y CHASSIS TANK CIRCUIT 100 SERIES 91H23 ...
Страница 91: ...EHV SUB ASS Y VALVE HOSE CIRCUIT SL 105 91H24 REV A ...