Photo 2. The head of the jib (1) is shackled to the top swivel (2) which is shackled to the
jib halyard (4).
Photo 3. The rope strop (1) should be regularly inspected for wear. Note how the strop is
folded over the boom, thus theoretically multiplying the ropes breaking load by 4.