INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
A horizontal line
A
at 835-935 mm above the cooker top.
A horizontal line
B
at a
X
mm above the horizontal line
A
.
A horizontal line
C
at a 11
6
mm below the horizontal line
A
.
Mark Points:
Mark a point (1) on the horizontal line
A
, 80 mm to the vertical reference line.
Repeat this operation on the other side , checking that the three marks are leveled.
Mark a point (2) on the horizontal line
B
, 40 mm to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
80
80
40
40
835-935
A
B
(1)
(2)
X
C
155
155
(3)
116
Option Chimney
X
1
400
+
0
/
2
400
+
300
410-650
3
400
+
390
410-740
Mark a point (3) on the horizontal line
C
, 155 mm to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
Vertical reference line
EN-5