6-4 KICK STARTER
• Inspect the return spring for damage.
• Inspect the kick starter drive gear teeth for wear and damage.
• Inspect the kick starter drive gear ratchet part for wear and
damage.
• Inspect the kick starter shaft and drive gear contact surface
for wear and damage.
• Inspect the kick starter idle gear teeth for wear and damage.
• Inspect the kick starter idle gear and driveshaft contact sur-
face for wear and damage.
REASSEMBLY
Reassemble the kick starter assembly in the reverse order of
disassembly. Pay attention to the following points:
• Fit the kick starter to the kick starter shaft.
NOTE:
Be sure to align the punched marks on the kick starter and kick
starter shaft.
• Install the kick starter assembly to the crankcase and hook
the return spring.
• Install the kick starter idle gear.
"
09900-06107: Snap ring pliers
Содержание RM 250 2003
Страница 1: ...OWNER S SERVICE MANUAL...
Страница 61: ...6 2 KICK STARTER CONSTRUCTION 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Страница 85: ...9 2 FUEL SYSTEM CONSTRUCTION 4 5 N m 0 45 kgf m 3 25 lb ft...
Страница 100: ...10 2 COOLING SYSTEM CONSTRUCTION 5 5 N m 0 55 kgf m 4 0 lb ft 10 N m 1 0 kgf m 7 0 lb ft...
Страница 117: ...12 2 CONSTRUCTIONS EXTERIOR PARTS Seat Bolt Washer Frame Frame cover Seat rail 5 N m 0 5 kgf m 3 5 lb ft...
Страница 198: ...18 TROUBLESHOOTING 18 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 18 2 ENGINE 18 2 CHASSIS 18 5...