FRONT AND REAR WHEELS 13-3
FRONT WHEEL REMOVAL AND
REASSEMBLY
FRONT WHEEL REMOVAL
• Loosen the axle shaft holder bolts
1
.
• Remove the axle nut
2
.
• Loosen the axle shaft holder bolts
3
.
• Place the motorcycle on a block to lift front wheel off the
ground.
• Remove the axle
4
.
• Remove the front wheel.
FRONT WHEEL REASSEMBLY
• Reassemble the spacer, front wheel and axle shaft.
• Tighten the axle nut to the specified torque with the special
tool.
!
09940-34581: Attachment F
"
Axle nut: 35 N·m (3.5 kgf-m, 25.5 lb-ft)
• Fit the axle holder and tighten the bolts temporarily.
• Remove the block from under the chassis tube and move the
front fork up and down several times.
• Tighten the axle holder bolts to the specified torque.
"
Axle holder bolt: 18 N·m (1.8 kgf-m, 13.0 lb-ft)
REAR WHEEL REMOVAL AND
REASSEMBLY
REAR WHEEL REMOVAL
• Remove the axle nut
1
.
• Loosen the chain adjuster lock nuts
2
and chain adjusters
3
.
• Place the motorcycle on a block to lift the rear wheel off the
ground.
• Remove the axle.
• Remove the rear wheel.
Содержание RM 250 2003
Страница 1: ...OWNER S SERVICE MANUAL...
Страница 61: ...6 2 KICK STARTER CONSTRUCTION 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Страница 85: ...9 2 FUEL SYSTEM CONSTRUCTION 4 5 N m 0 45 kgf m 3 25 lb ft...
Страница 100: ...10 2 COOLING SYSTEM CONSTRUCTION 5 5 N m 0 55 kgf m 4 0 lb ft 10 N m 1 0 kgf m 7 0 lb ft...
Страница 117: ...12 2 CONSTRUCTIONS EXTERIOR PARTS Seat Bolt Washer Frame Frame cover Seat rail 5 N m 0 5 kgf m 3 5 lb ft...
Страница 198: ...18 TROUBLESHOOTING 18 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 18 2 ENGINE 18 2 CHASSIS 18 5...