MTU/MTW011
Mini Town Tea Shop
Installation Instruction
1. Check using the parts list that all components have been delivered.
2. Plan the final position of the play equipment, ensuring there is sufficient space.
NB: Please consider the extent and HIC of surfacing (see surfacing plan).
Although this unit does not require safety surfacing when installed in to grass,
no hard edges are permitted within the minimum use zone indicated on the
plan. LOOSE FILL INSTALLATION REQUIRES ADDITIONAL EXTENSIONS,
see page 18.
3. Excavate the foundation holes in accordance with the plan and play level,
ensuring the intended safety surface area is level. If you are installing on
to any significant gradient, please seek the advice of Sutcliffe Play prior to
installation.
NB: DO NOT TIGHTEN FIXINGS OR APPLY NUT COVERS UNTIL THE
WHOLE UNIT IS ASSEMBLED.
4. Assemble posts (
MTP120 x4
) into foundation holes to construct the tower',
attaching the deck supports (
MTI023 x 2
) as indicated. Attach the Deck
Panel (
MPP033 x 1
), see
pages 8 & 9
. Fix two more
MTI023
s at the central
holes on the posts to recieve the Cooker & Drainer Panels at a later stage.
Fix Curved Rails (
MTI033 x 2
)
,
see
page 8
. PLEASE CHECK PLAY LEVEL
LINES ON POSTS ARE SET TO THE FINISHED PLAY LEVEL.
5. Offer up the Door Panel
MPP035 x 1
and 'Pots & Pans' Panel
MPA036 x1
using fixings indicated on
Pages.10, 13 &14
.
Rev 02
Page 2