Installation Instructions
SAFETY SURFACING AREA 10.8M²
PERIMETER 12M
HIC 0.6M
Installation procedure
1. Plan the final position of the play equipment ensuring
that there is sufficient space*.
2. Excavate the foundation hole in accordance with the
plan**.
3. Place the ground fixing in the foundation hole, ensure
it is level and at the required depth. Fill with concrete.
4. When the concrete has set (2 - 3 days) fit the
Springie top.
5. Do not allow the equipment to be used until the
concrete has set (2 - 3 days) and the required safety
surface has been installed.
6. Check if all the fixing bolts are tight.
7. Follow the Maintenance Instructions provided.