Installation Instructions

SAFETY SURFACING AREA 10.8M²

PERIMETER 12M

HIC 0.6M

Installation procedure

1.  Plan the final position of the play equipment ensuring 

that there is sufficient space*.

2.  Excavate the foundation hole in accordance with the 

plan**.

3.  Place the ground fixing in the foundation hole, ensure 

it is level and at the required depth.  Fill with concrete.

4.  When the concrete has set (2 - 3 days) fit the 

Springie top.

5.  Do not allow the equipment to be used until the 

concrete has set (2 - 3 days) and the required safety 

surface has been installed.

6.  Check if all the fixing bolts are tight.

7.  Follow the Maintenance Instructions provided.

Important Note

 

*  Care should be taken when installing the product,

 

  to reduce the hazard for the user.

  **  Care should be taken if conditions aren’t normal.